Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a water / sewer project in Granbury, Texas. Completed plans call for the construction of a water / sewer project.
The City of Granbury Is Proposing to Upgrade as Well as Expand Its Water Treatment Plant (Wtp), Which Is Located in the City of Granbury. The Existing 2.5 Million Gallon per Day (Mgd) Facility Is Being Expanded to 5.0 Mgd. While Time Is Always of the Essence, the City Wishes to Obtain a Balance Between Expedited Construction and Maximizing Cost Efficiency in Construction and Construction Manager At-risk Has Been Chosen as the Project Delivery Method That Will Allow the City to Best Meet the Time and Budget Constraints of This Important Project. It Is Expected That the Construction Manager At-risk Will Achieve This Through Seamless Collaboration with the Owner and Design Engineer During All Phases of the Project. Phase One Services Generally Consist of Value Engineering, Design Reviews, Cost Estimating, Schedule Development and Management, Risk Management Planning as Well as Preparation, In-close Collaboration with the Owner, of a Gmp Proposal. The Gmp Proposal Shall Be Based on the Project's Design (Expected to Be No Less than 60% Level of Completion), the Owner Project Schedule, and Will Include Supporting Documentation, Such as Detailed Open-book Costing for the Gmp. Phase Two Services Generally Encompass Completing the Projects Construction and Performance Testing. Early-out Packages During Phase One Will Accelerate Phase Two Services for Those Packages. Phase One Services • Develop the Project Execution Plan, Including Project Schedule for Submittals, Equipment Delivery, General Construction, Equipment Startup and Performance Testing; • Perform Value Engineering and Design Reviews on Design Development Submittals in Conjunction with the Owner and the Design Engineer; • Prepare and Maintain a Project Cost Model and Submit Detailed Cost Estimates as the Design and Design Alternatives Are Advanced; • Prepare, Implement and Maintain a Project Risk Management Plan; • Submit and Negotiate Gmp Proposals for Performance of Phase Two Services (Includes Early-out Packages); And • Identify Project Permitting Requirements and Initiate Certain Permitting Activities (Anticipated to Be Limited to Stormwater Construction General Permit and Local Building Permits). Phase Two Services: • Perform Value Engineering and Constructability Reviews on Design Development Submittals in Conjunction with the Owner and the Design Engineer; • Procure Equipment and Subcontractors; • Secure Necessary Permits (Anticipated to Be Limited to Stormwater Construction General Permit and Local Building Permits); • Construct the Project; • Mitigate Project Risks; • Conduct Startup, Commissioning and Performance Testing; • Provide Operator Training; And • Provide One Year Warranty Coverage.
Award
Water / Sewer
$11,700,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 1, 2018
March 1, 2019
1420 E Pearl St, Granbury, TX
Related To This Project
Granbury, TX
--
Granbury, TX
Bid Date: Jul 11 2023
Granbury, TX
Bid Date: Jul 13 2023
Granbury, TX
Bid Date: Aug 03 2023
Granbury, TX
Bid Date: Jul 25 2023
Granbury, TX
Bid Date: Jan 12 2021
Granbury, TX
Bid Date: Mar 31 2022
Granbury, TX
Bid Date: Mar 10 2020
Granbury, TX
Bid Date: Oct 27 2020
2021 Street Improvements Phase II Harbor Lakes Drive, M&M Ranch Road and Industrial Avenue - 4458996
Granbury, TX
Bid Date: Sep 14 2021
Granbury, TX
Bid Date: Oct 12 2021
Granbury, TX
--
Granbury, TX
Bid Date: Sep 03 2019
Granbury, TX
Bid Date: Mar 30 2021
Granbury, TX
Bid Date: Aug 13 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.