Published March 12, 2020 at 8:00 PM

Updated October 1, 2024

Site work and new construction of an educational facility in West Windsor, New Jersey. Completed plans call for the construction of a educational facility.

The bids will be publicly opened and read aloud at the time and place set forth above. No bids will be received after that time unless the contract is re-advertised for bids. Bidders are responsible for seeing that their bids arrive at the Purchasing Office at the address specified above before the opening date and time. Bids delivered in person or by express service should be delivered directly to the Purchasing Office. Bidders must contact Fred Carella at the College (carellaf@mccc.edu) to obtain a site visitation. Bidders are subject to the provisions of the County College Contracts Laws N.J.S.A. 18A:64A-25.25 governing bidding requirements. Bidders for contracts exceeding the bid threshold must be pre-qualified by the state of New Jersey, Department of the Treasury, Division of Property Management and Construction. Bidding Contractors must be pre-qualified as either "C008 General Construction" or "C009 General Construction / Alterations and Additions". Each bid must be accompanied by an affidavit so certifying. There will not be a pre-bid meeting. Bidders are required to comply with the requirements of P.L. 1975, c.127 (N.J.A.C. 17:27) and P.L. 1999, c.238 "The Public Works Contractor Registration Act." and the requirements of P.L. 2004, c. 57 Contractors Business Registration Act. Bidders are required to comply with the requirements of "An Ordinance Establishing a Qualified Minority, Women, Veteran-Owned Business, or Small Business Set-Aside Program", Ordinance 2018-5, enacted pursuant to and in accordance with the provisions of N.J.S.A. 40A:11-41, et seq. Neither the Mercer County Community College, nor the Architect will assume any responsibility for Bids mailed or misdirected in delivery. A separate non-refundable cost of Twenty Five ($25.00) Dollars per set will be charged for handling and mailing via overnight delivery to Contractors if requested. A separate non-refundable handling charge of Ten ($10.00) Dollars per set will be charged for sending Contract Documents via overnight delivery as prearranged and paid for by the Bidder. Non-refundable check(s) for Bidding documents shall be made payable to the "Spiezle Architectural Group, Inc." All Bidders should contact the Architect's Office at (609) 695-7400 to confirm details of availability of Bidding Documents. Bidders who obtain Bidding Documents on CD are advised that a hard copy set of documents will be maintained in the office of the Architect and the office of the Owner.

Under Construction

Educational

$8,036,000.00

Public - County

New Construction, Site Work

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Alternates, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Manufacturer?s Field Services, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Temporary Roads, Execution and Closeout Requirements, Examination and Preparation, Acceptance of Conditions, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Steel Joist Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Membrane Roofing, Roof and Wall Specialties and Accessories, Roof Accessories, Roof Hatches, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Folding Doors and Grilles, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Elevator Equipment and Controls, Elevator Equipment, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping, Fire Suppression Systems Insulation, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Cables, Low-Voltage Electrical Power Conductors and Cables, Control-Voltage Electrical Power Cables, Underground Ducts and Raceways for Electrical Systems, Commissioning of Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Concrete Curbs and Gutters, Paving Specialties, Pavement Markings, Painted Pavement Markings, Site Improvements, Fences and Gates, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations, Communications Utilities, Communications Structures, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation

Find More Local Projects

Within 75 Miles of This Project
554
Active Projects
315
Bidding Soon
4,900
All Active Projects
2,207
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2018

February 6, 2019

img_map_placeholder

1200 Old Trenton Rd, West Windsor, NJ


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

University Center at the West Windsor Campus

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.