Demolition, site work, paving and new construction of a civil project in Cody, Wyoming. Completed plans call for site work for a road / highway; for paving for a road / highway; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

*Contract Award Date: April 15, 2019 Contract Award Number: 6982AF19C000013 Contract Award Dollar Amount: $11,768,344.88 Contractor Awarded Name: Mountain Construction Company Contractor Awarded DUNS: 096887539 Contractor Awarded Address: PO Box 518 Lovell, Wyoming 82431 United States The proposed project is located in Park County, Wyoming on County Route 6WX, also known as the Southfork Road. The project beings at the Cabin Creek Trailhead or end of the road (MP 42.7) and heads northeast approximately 15 miles. This project includes 7.3 miles of gravel rehabilitation and resurfacing, 6.3-7.5 miles of roadway reconstruction and paving, replacement of the EGF or Ishawooa Bridge and potential replacement of the Little Boulder Creek Bridge (on Hunter Creek Road). Significant items and quantities: Project will include excavation, aggregate base, surface course aggregate, paving, bridge, riprap, drainage, survey, erosion control, permanent and temporary traffic control, and revegetation. Major quantities include: 60 +/- acres of clearing and grubbing 65,000 +/- cuyd of roadway excavation 2,500 +/- cuyd of riprap 180 +/- cuyd of structural concrete 180,000 +/- lbs of structural steel 18,000 +/- cuyd of surface course aggregate 26,000 +/- cuyd of aggregate base course 21,000 +/- tons of Superpave PavementWolfsen Road (Local Route R337). The Southfork Road will remain open during construction. Delay and one-lane road scenarios will be allowed. Weather conditions on this route are extreme; cold weather and snow are likely during fall, winter and spring months. Snow pack recession time frame varies, and is dependent upon accumulation and temperatures. Anticipated Anticipated Construction Duration: April 2019 through November 2019 Note: Note that the weather conditions on this route are extreme; cold weather and snow are likely during fall, winter, and spring months. Snow pack recession timeframe varies, and is dependent upon accumulation and temperatures. Anticipated Award Amount: $7-12M Place of Performance: County Route 6WX Park County Wyoming United States A Notice to Proceed must be issued before commencement of any work. The contract completion date for all work, excluding work required between STA 705+00 to 709+00, is October 31, 2019. The contract completion date for the completion of all work is November 30, 2019. No additional contract time will be provided if Option X or Option Y are awarded. The currently proposed dates for use are from April 28, 2019 to November 30, 2019, and if a second construction season is needed to complete the project from May 1,2020 to November 15, 2020.

Award

Roads / Highways

$11,768,345.00

Public - Federal

Demolition, New Construction, Paving, Site Work

431

1

4

13

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
37
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.