BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2024 at 7:00 PM

Updated November 21, 2024

New construction of a fire / police facility in Campbell River, British Columbia. Conceptual plans call for the construction of a fire / police facility.

Construction of a new fire hall to replace the existing Fire Hall #1. TIMELINE: Project is on hold pending funding. A timeline has not been established. An update may be available in early 2026. Budget estimate is unconfirmed. NOTE: Behr Integrated Solutions Inc. is the consultant for the feasibility study.

Conceptual

Fire / Police

$15,000,000.00

Public - City

New Construction

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
6
Bidding Soon
115
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2027

Project location map

To Be Determined, Campbell River, BC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.