Renovation of an educational facility in Slippery Rock, Pennsylvania. Completed plans call for the renovation of a educational facility.

AES Project #20-225 This PROJECT IS A STANDARD LOW BID PROJECT and includes GENERAL, HVAC, PLUMBING AND ELECTRICAL CONSTRUCTION. ESTIMATED RANGE: .1 General - $4,000,000 - $5,000,000 .2 HVAC - $1,000,000 - $2,000,000 .3 Plumbing - Under $100,000 & .4 Electrical - $2,000,000 - $3,000,000 LIQUIDATED DAMAGES = (.1) $1,250.00 per day, (.2) $500.00 per day, (.3) $220.00 per day & (.4) $750.00 per day. There is no Bid Guaranty required for this Project. Client Agency Requirements - Passes can be obtained on-line at the SRU website. Parking Office | Slippery Rock University (sru.edu) The process will indicate where they can park. Projects located at any Centers for Medicare & Medicaid Services (CMS) Facilities listed on the Department's January 24. 2022, and March 25, 2022, Notices must continue to follow the "Interim Final Rule COVID-19 Vaccination Requirements" and deadlines. Projects at all Non-CMS Facilities are encouraged to follow COVID-19 vaccination requirements. Guidelines and site access requirements vary per site, and some agencies may have more stringent requirements which will be noted in their project's Notice to Bidders. The Department of General Services Public Works and the Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. However, BDISBO did not set SDB and/or VBE participation goals for those procurements that are less than the $400,000 threshold required to set either goal. In addition, there will be no points allocated toward SDB/SB participation for this procurement. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Public Works. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .1 General Construction - ALL BASE BIDS (#1, #2, #3, & #4) SDB = 7% VBE = 3% .2 HVAC Construction - ALL BASE BIDS (#1, #2, #3, & #4) SDB = 5% VBE = 3% .3 Plumbing Construction - ALL BASE BIDS (#1, #2, #3, & #4) SDB = 8% VBE = 3% .4 Electrical Construction ALL BASE BIDS (#1, #2, #3, & #4) SDB = 14% VBE = 3% This is a whole building renovation of a 1970's masonry building with two additions. Exterior work includes replacing portions of the roof, replacing all the windows and curtain walls, inserting new window locations, and replacing pavement, stairs, and a loading dock that are past their prime. Formerly the university union, the building is being converted to a student success center and wellness center. Spaces are being created for offices and health clinic functions, which will include some small floor infills. Some of the building will be demolished and retained as shell space. Interior systems work includes complete replacement of the plumbing, HVAC, fire protection, and electrical systems. B. General Construction (.1) Contract: 1. Roofing, window, and curtain wall replacement. 2. Site work 3. Interior demolition and renovation, some shell work. 4. Elevator replacement C. HVAC Construction (.2) Contract: 1. Demolition of most equipment and devices. 2. New steam/DX rooftop units 3. New ductwork distribution 4. New fan powered and VAV boxes and GRDs D. Plumbing Construction (.3) Contract: 1. Domestic cold water, hot water, and hot water return piping systems 2. Sanitary and vent piping systems. 3. Storm and emergency storm piping systems. 4. Wet automatic sprinkler system. 5. Demolition of most equipment and devices. E. Electrical Construction (.4) Contract: 1. Demolition of most equipment, fixtures, and devices. 2.Complete replacement of electrical distribution equipment downstream from the two main switchboards. 3. Lighting and lighting controls. 4. Receptacles and power devices. 5. Fire alarm system, including head-end equipment and initiating and notification devices. 6. Low voltage system head-end equipment and devices. Bid Result : Bid Package Name: DGS C-0413-0053 P1.1 Base Bid 1 - Hudson Construction - $ 8,789,000.00 Base Bid 2 - Hudson Construction - $ 9,202,000.00 Base Bid 3 - Hudson Construction - $ 9,430,000.00 Base Bid 4 - Hudson Construction - $ 9,430,000.00 Bid Package Name: DGS C-0413-0053 P1.2 Base Bid 1 - Renick Brothers Construction Co - $ 2,595,000.00 Base Bid 2 - Renick Brothers Construction Co - $ 2,595,000.00 Base Bid 3 - Renick Brothers Construction Co - $ 2,595,000.00 Base Bid 4 - Renick Brothers Construction Co - $ 3,195,000.00 Bid Package Name: DGS C-0413-0053 P1.3 Base Bid 1 - Vrabel Plumbing Company - $ 1,114,200.00 Base Bid 2 - Vrabel Plumbing Company - $ 1,114,200.00 Base Bid 3 - Vrabel Plumbing Company - $ 1,114,200.00 Base Bid 4 - Vrabel Plumbing Company - $ 1,114,200.00 Bid Package Name: DGS C-0413-0053 P1.4 Base Bid 1 - Merit Electrical Group, Inc - $ 2,667,000.00 Base Bid 2 - Merit Electrical Group, Inc - $ 2,672,000.00 Base Bid 3 - Merit Electrical Group, Inc - $ 2,893,000.00 Base Bid 4 - M3T CORPORATION - $ 323,088.00

Bid Results

Educational

$60,842,888.00

Public - State/Provincial

Renovation

255

34

35

5

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Sanitary Facilities, Temporary Construction, Temporary Barriers and Enclosures, Temporary Barricades, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Spare Parts, Demonstration and Training, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Specialty Placed Concrete, Post-Tensioned Concrete, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Railings, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Vapor Retarders, Roofing and Siding Panels, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Wood Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Glazed Aluminum Curtain Walls, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Flooring Treatment, Resilient Flooring, Carpeting, Wall Finishes, Special Wall Surfacing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Audio-Video Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Art, Window Treatments, Furnishings and Accessories, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Elevator Equipment and Controls, Elevator Equipment
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Storm Drainage, Roof Drains, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Battery Chargers, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Fans, Blowers and Pumps, Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
130
Bidding Soon
1,173
All Active Projects
555
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2022

December 27, 2022

img_map_placeholder

1 Morrow Way, Slippery Rock, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Student Success Center Renovation - Slippery Rock University

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.