Renovation of an educational facility in Slippery Rock, Pennsylvania. Completed plans call for the renovation of a educational facility.
AES Project #20-225 This PROJECT IS A STANDARD LOW BID PROJECT and includes GENERAL, HVAC, PLUMBING AND ELECTRICAL CONSTRUCTION. ESTIMATED RANGE: .1 General - $4,000,000 - $5,000,000 .2 HVAC - $1,000,000 - $2,000,000 .3 Plumbing - Under $100,000 & .4 Electrical - $2,000,000 - $3,000,000 LIQUIDATED DAMAGES = (.1) $1,250.00 per day, (.2) $500.00 per day, (.3) $220.00 per day & (.4) $750.00 per day. There is no Bid Guaranty required for this Project. Client Agency Requirements - Passes can be obtained on-line at the SRU website. Parking Office | Slippery Rock University (sru.edu) The process will indicate where they can park. Projects located at any Centers for Medicare & Medicaid Services (CMS) Facilities listed on the Department's January 24. 2022, and March 25, 2022, Notices must continue to follow the "Interim Final Rule COVID-19 Vaccination Requirements" and deadlines. Projects at all Non-CMS Facilities are encouraged to follow COVID-19 vaccination requirements. Guidelines and site access requirements vary per site, and some agencies may have more stringent requirements which will be noted in their project's Notice to Bidders. The Department of General Services Public Works and the Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. However, BDISBO did not set SDB and/or VBE participation goals for those procurements that are less than the $400,000 threshold required to set either goal. In addition, there will be no points allocated toward SDB/SB participation for this procurement. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Public Works. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .1 General Construction - ALL BASE BIDS (#1, #2, #3, & #4) SDB = 7% VBE = 3% .2 HVAC Construction - ALL BASE BIDS (#1, #2, #3, & #4) SDB = 5% VBE = 3% .3 Plumbing Construction - ALL BASE BIDS (#1, #2, #3, & #4) SDB = 8% VBE = 3% .4 Electrical Construction ALL BASE BIDS (#1, #2, #3, & #4) SDB = 14% VBE = 3% This is a whole building renovation of a 1970's masonry building with two additions. Exterior work includes replacing portions of the roof, replacing all the windows and curtain walls, inserting new window locations, and replacing pavement, stairs, and a loading dock that are past their prime. Formerly the university union, the building is being converted to a student success center and wellness center. Spaces are being created for offices and health clinic functions, which will include some small floor infills. Some of the building will be demolished and retained as shell space. Interior systems work includes complete replacement of the plumbing, HVAC, fire protection, and electrical systems. B. General Construction (.1) Contract: 1. Roofing, window, and curtain wall replacement. 2. Site work 3. Interior demolition and renovation, some shell work. 4. Elevator replacement C. HVAC Construction (.2) Contract: 1. Demolition of most equipment and devices. 2. New steam/DX rooftop units 3. New ductwork distribution 4. New fan powered and VAV boxes and GRDs D. Plumbing Construction (.3) Contract: 1. Domestic cold water, hot water, and hot water return piping systems 2. Sanitary and vent piping systems. 3. Storm and emergency storm piping systems. 4. Wet automatic sprinkler system. 5. Demolition of most equipment and devices. E. Electrical Construction (.4) Contract: 1. Demolition of most equipment, fixtures, and devices. 2.Complete replacement of electrical distribution equipment downstream from the two main switchboards. 3. Lighting and lighting controls. 4. Receptacles and power devices. 5. Fire alarm system, including head-end equipment and initiating and notification devices. 6. Low voltage system head-end equipment and devices. Bid Result : Bid Package Name: DGS C-0413-0053 P1.1 Base Bid 1 - Hudson Construction - $ 8,789,000.00 Base Bid 2 - Hudson Construction - $ 9,202,000.00 Base Bid 3 - Hudson Construction - $ 9,430,000.00 Base Bid 4 - Hudson Construction - $ 9,430,000.00 Bid Package Name: DGS C-0413-0053 P1.2 Base Bid 1 - Renick Brothers Construction Co - $ 2,595,000.00 Base Bid 2 - Renick Brothers Construction Co - $ 2,595,000.00 Base Bid 3 - Renick Brothers Construction Co - $ 2,595,000.00 Base Bid 4 - Renick Brothers Construction Co - $ 3,195,000.00 Bid Package Name: DGS C-0413-0053 P1.3 Base Bid 1 - Vrabel Plumbing Company - $ 1,114,200.00 Base Bid 2 - Vrabel Plumbing Company - $ 1,114,200.00 Base Bid 3 - Vrabel Plumbing Company - $ 1,114,200.00 Base Bid 4 - Vrabel Plumbing Company - $ 1,114,200.00 Bid Package Name: DGS C-0413-0053 P1.4 Base Bid 1 - Merit Electrical Group, Inc - $ 2,667,000.00 Base Bid 2 - Merit Electrical Group, Inc - $ 2,672,000.00 Base Bid 3 - Merit Electrical Group, Inc - $ 2,893,000.00 Base Bid 4 - M3T CORPORATION - $ 323,088.00
Bid Results
Educational
$60,842,888.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
Division 44 - Pollution Control Equipment
Division 48 - Electrical Power Generation
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 2, 2022
December 27, 2022
1 Morrow Way, Slippery Rock, PA
Related To This Project
Slippery Rock, PA
Bid Date: Nov 10 2022
Slippery Rock, PA
Bid Date: Oct 27 2022
Slippery Rock, PA
Bid Date: Dec 08 2022
Slippery Rock, PA
Bid Date: May 20 2021
Slippery Rock, PA
Bid Date: Apr 11 2022
Slippery Rock, PA
Bid Date: Apr 11 2022
Slippery Rock, PA
Bid Date: Apr 06 2022
Saint Marys, PA
Bid Date: Oct 26 2022
Bloomsburg, PA
Bid Date: Nov 15 2022
Philadelphia, PA
Bid Date: Nov 15 2022
Washington, PA
Bid Date: Dec 02 2022
Philadelphia, PA
Bid Date: Nov 15 2022
Philadelphia, PA
Bid Date: Nov 15 2022
Kimberton, PA
Bid Date: Oct 28 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.