BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2025 at 8:00 PM

Updated July 9, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Tunkhannock, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Project Involves Replacing an Existing 19-foot Long, Single-span, Reinforced Concrete Slab Bridge on Sr 2007 Section D52 in Eaton Twp, Wyoming County, in the Commonwealth of Pennsylvania. Replacement of the Keelersburg Road (Sr 2007) Bridge Over an Unnamed Tributary to the Susquehanna River in Eaton Township, Wyoming County, Pa. The Proposed Structure is a Single Span Integral Abutment Bridge Utilizing Four (4) - 48" X 17" Prestressed Concrete Spread Box Beams With an 8" Thick Composite Concrete Deck. Details of Proposed Structure Include, a 40-foot Long Single Span, Lane Widths and Shoulder Widths Are 10 Feet and 4 Feet Respectively, Which Are the Minimum Required. Project is Located From Approximately Segment 0100 Offset 1377 to Approximately Segment 0110 Offset 0059. The Project is Expected to Be Built Under Temporary Road and Temporary Bridge Traffic. . The Temporary Road Will Consist of a Single, Bi-directional Lane With a Width of 12 Feet and Include 2 Foot Shoulders. Temporary Traffic Signals Will Control Each End of the Temporary Road. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 55.00% Anticipated NTP: 08/11/2025 Required Completion: 11/19/2026 Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT: SR 2007 Over Tributary to Susquehanna River *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$1,711,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

133

13

15

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
253
Active Projects
115
Bidding Soon
1,348
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

August 11, 2025

Project location map

State Rte 2007, Tunkhannock, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.