BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 6, 2024 at 7:00 PM

Updated December 7, 2024

Site work and paving for a road / highway in Longmont, Colorado. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

This project includes safety and capacity improvements at one of the busiest intersections in Longmont. The proposed improvements would consist of the recommended alternative (Alternative 1A) from the Southwest Longmont Operations Study. This alternative is a grade separated intersection that would add additional through and left-turn lanes for the NB, SB and EB directions. The westbound through lanes would be grade separated (under Hover Street), making this a free-running movement. The recommended alternative also includes enhancements for pedestrians, bicyclists and transit users. Pedestrian and bicycle access would be improved with an east-west grade separated walkway in the tunnel. Eastbound SH 119 bus-only lanes, coupled with transit signal prioritization, would allow buses to proceed ahead of the general purpose traffic lanes. Due to its close proximity to the Ken Pratt Blvd/Hover St intersection, improvements would also be required at the Clover Basin Drive and Hover Street intersection to the north. Anticipated improvements at Clover Basin/Hover include the construction of NB dual left turn lanes. The County was awarded a federal RAISE grant in 2023 to help fund this project. The CIP shows the required local match of $2 million for this funding. Construction of the proposed improvements requires participation from various project stakeholders (e.g. Federal, State, County, RTD, etc.), with the State/CDOT identified as the lead agency. As of December 6, 2024, this project is included in the City of Longmont's Fiscal Year 2024-2028 CIP. Further infromation regarding a design firm and timeline for construction has not yet been established. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
65
Bidding Soon
1,316
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2027

Project location map

CO-119, Longmont, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.