BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Bradenton, Florida. Working plans call for site work for a water / sewer project.

UPDATE: https://cdn5-hosted.civiclive.com/UserFiles/Servers/Server_7588306/File/Departments/Financial%20Management/CIP/FY23-27%20AD%20CIP%20Book_%20Reduced.pdf Replace approximately 2,000 linear feet of two inch and four inch water mains mostly on easements with poor access and limited fire protection with six inch water mains and 42 new services installed from main to meter. Meters will be relocated to front right-of-way with six valves, three fire hydrants, and eliminate mains on easements. All items will be installed to County and Ten State Standards. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of December 01, 2022, further details regarding design and construction have not been identified. ______________________________________________________________________ https://p1cdn4static.civiclive.com/UserFiles/Servers/Server_7588306/File/Departments/Financial%20Management/CIP/Adopted%20CIP%20Book_Reduced%20Size.pdf Replace approximately 2,000 linear feet of two inch and four inch water mains mostly on easements with poor access and limited fire protection with six inch water mains and 42 new services installed from main to meter. Meters will be relocated to front right-of-way with six valves, three fire hydrants, and eliminate mains on easements. All items will be installed to County and Ten State Standards. Project is included Manatee County FY 2022-2026 CIP Page 353 _______________________________________________________________________________________ https://www.mymanatee.org/UserFiles/Servers/Server_7588306/File/FY21-25%20Adopted%20Capital%20Improvement%20Plan%20Compressed.pdf The project will complete a looped system with 1,300 linear feet of existing two inch water main. Hydrants, services and valves should be installed to County and Ten State Standards. Project is included Manatee County FY 2021-2025 CIP Page 339 _____________________________________________________ The project will complete a looped system with 1,300 linear feet of existing two inch water main. Hydrants, services and valves should be installed to County and Ten State Standards. The project is included in the 2021-2025 Capital Improvement Program (CIP). As of February 5, 2021, design is complete and construction will be performed in-house. A timeline is not available. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Water / Sewer

$221,180.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
51
Bidding Soon
924
All Active Projects
364
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2023

img_map_placeholder

52nd St Ct W, Bradenton, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.