BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 13, 2023 at 8:00 PM

Updated November 15, 2023

Demolition, site work and addition to a civil project in Bradenton, Florida. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; and for site work for a water / sewer project.

Bidders may contact by e-mail Bids@jonesedmunds.com for questions, clarifications, and interpretations regarding the Bid Documents. Requests for information can be submitted by email until 5:00 pm Friday, July 14, 2023. The project is at the City of Bradentons Wastewater Treatment Facility at 1810 1st Street West, Bradenton, Florida 34205. The Work is generally described as the construction and addition of a fourth clarifier to the City of Bradentons wastewater system. The work includes, but is not limited to, installation of a 150-foot-diameter clarifier, a return-activated sludge (RAS) pump station, a scum pump station, an electrical building, sludge drying cells, bollards, concrete mow stripping, and associated pipes, valves, fittings, and appurtenances to connect to the existing system. The project also includes modification to the existing clarifier flow splitter box, staircase, and walkway; demolition of any existing piping to accommodate the proposed installations and modifications, the existing aerobic digester, and the dissolved air floatation unit; and removal and replacement of portions of the plant roadway, existing sludge drying bed, and drainage piping. The work shall be performed as described for a complete and operable system as accepted by the Owner. Other roadway enhancements include removing and installing gravity structures and piping, and associated grading, milling, resurfacing, and paving Project Number - COB-21-001, 01890-004-01 The Work is generally described as the construction and addition of a fourth clarifier to the City of Bradentons wastewater system. The work includes, but is not limited to, installation of a 150-foot-diameter clarifier, a return-activated sludge (RAS) pump station, a scum pump station, an electrical building, sludge drying cells, bollards, concrete mow stripping, and associated pipes, valves, fittings, and appurtenances to connect to the existing system. The project also includes modification to the existing clarifier flow splitter box, staircase, and walkway; demolition of any existing piping to accommodate the proposed installations and modifications, the existing aerobic digester, and the dissolved air floatation unit; and removal and replacement of portions of the plant roadway, existing sludge drying bed, and drainage piping. The work shall be performed as described for a complete and operable system as accepted by the Owner. Other roadway enhancements include removing and installing gravity structures and piping, and associated grading, milling, resurfacing, and paving.

Award

Water / Sewer

$15,909,210.00

Public - City

Addition, Demolition, Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
293
Active Projects
116
Bidding Soon
2,114
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2023

August 21, 2023

Project location map

1810 1st Ave W, Bradenton, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.