BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 22, 2021 at 7:00 PM

Updated January 26, 2024

Site work for a road / highway in Irvine, California. Completed plans call for site work for a road / highway.

The work to be performed shall include, but not be limited to: traffic signal conduit installation; traffic signal pull box replacements and new installations; traffic signal fiber optic interconnect installation; traffic signal twisted pair interconnect installation; new traffic signal controller installation; new signal cabinet installation on existing foundation; video detection system installation; ethernet switch installation; and other items not mentioned here, but are required by the Special Provisions. See attached IFB Document for details. All contractors and subcontractors who plan to bid on a public works project when the project is for construction, alteration, demolition, installation, or repair work with a value exceeding $25,000.00 must first be registered and pay an annual fee with the DIR. Additionally, all contractors and subcontractors who plan to bid on public works projects involving maintenance work with a value exceeding $15,000.00 must first be registered and pay an annual fee with the DIR. The CITY requires all contractors and subcontractors to be registered with the DIR prior to submitting a bid meeting these parameters. Subject to the exceptions set forth in Labor Code Section 1725.5, bids from contractors that are not currently registered will be deemed nonresponsive. Further, the CITY will not award a contract to and no contractor or subcontractor will be allowed to work on a CITY public works project meeting these parameters unless they are registered with the DIR pursuant to Labor Code Section 1725.5. Please visit the DIR website for further information. Contact Info Brian D. Brown, CPSM bbrown@cityofirvine.org Pre-Bid Meeting No LOCATION OF THE WORK: City of Irvine, Orange County, on Culver Drive/Bonita Canyon Drive from Viewpark Avenue to Newport Coast Drive, and in the City of Newport Beach, Orange County on Bonita Canyon Drive/Ford Road from Chambord to Jamboree. DESCRIPTION OF WORK: The work to be performed shall include, but not be limited to: traffic signal conduit installation; traffic signal pull box replacements and new installations; traffic signal fiber optic interconnect installation; new traffic signal controller installation; new signal cabinet installation on existing or new foundation(s); CCTV's, Emergency Vehicle Preemption (EVP); ethernet switch installation; and other items not mentioned here, but are required by the Special Provisions. The Engineer's construction cost estimate for the project is $620,000.00 (rounded up to the nearest ten thousand)

Award

Roads / Highways

$669,745.00

Public - City

Site Work

19

6

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
565
Active Projects
218
Bidding Soon
3,979
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 29, 2020

January 28, 2021

Project location map

Bonita Canyon Dr and Culver Dr, Irvine, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.