BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Irvine, California. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

The work to be performed shall include, but not be limited to: Construction of new buildings (stage, restrooms, catering kitchen, and pump house), site work, utility improvements (including new sewer line), accessibility improvements, landscaping and irrigation, responsibility to design and install the fire suppression system, fuel modifications for a project located within a Very High Fire Hazard Severity Zone (VHFHSZ), and other items not mentioned here, but are required by the plans and the Special Provisions. The Engineer's construction cost estimate for the project is $4,000,000. CONTRACTORS STATE LICENSE REQUIREMENTS: Class A. PROJECT LOCATION AND SCHEDULE: 11 Bommer Canyon Drive, Irvine, California. Two-hundred (200) working days to complete. Prevailing wage requirements apply to public works projects with a value exceeding $1,000.00. The definition of "public works" is found at Labor Code Section 1720, et seq.

Bid Results

Playgrounds / Parks / Athletic Fields

$3,844,101.00

Public - City

Site Work

134

24

5

4

Subscribe For Documents

91 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
553
Active Projects
242
Bidding Soon
3,988
All Active Projects
1,852
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 22, 2020

December 21, 2020

img_map_placeholder

11 Bommer Canyon, Irvine, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.