EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 19, 2021 at 8:00 PM

Updated October 1, 2024

Demolition and site work for a medical facility in Allentown, Pennsylvania. Completed plans call for the demolition of a medical facility; and for site work for a medical facility.

https://www.mcall.com/news/local/allentown/mc-nws-allentown-state-hospital-redevelopment-scenarios-city-council-20210311-ielaiyv66jdejiaoopgpikfay4-list.html Allentown State Hospital is gone, and officials have begun to consider in earnest what the future holds for the 200-acre site along Hanover Avenue. Allentown on Wednesday released a 91-page reuse feasibility study for the east Allentown property. The report, completed by Michael Baker International, offers three redevelopment scenarios with varying mixes of residential, industrial, commercial and institutional land uses. For each scenario, the study estimates the number of permanent jobs created (as many as 6,600) and amount of annual city tax revenue generated (up to $6 million), among other projections. Advertisement 04:02 04:49 A reminder: Pennsylvania, not Allentown, owns the state hospital land. But the city controls the site's rezoning and will have considerable say in the redevelopment process. Local leadership "can have significant roles to play in establishing a favorable development atmosphere, serving to manage community expectations and robustly champion the success of the redevelopment effort," the study concludes. Gov. Tom Wolf in July 2019 enacted a law that required the state Department of General Services to demolish 44 buildings and structures on the site before creating a competitive bidding process for the sale of the property. The roughly $13 million demolition unfolded over the latter half of 2020. A committee consisting of state Sen. Pat Browne, R-Lehigh; state Rep. Mike Schlossberg, D-Allentown; Leonard Lightner, Allentown's director of community and economic development; and Secretary of General Services Curt Topper will review proposals and recommend a buyer. (The site is in Browne's and Schlossberg's districts.) The committee will choose a development proposal based upon best value and return on investment. While not binding, the redevelopment scenarios contemplated in the feasibility study will inform the selection process. Allentown will also consider the study as it updates its zoning ordinance, which dictates, among other things, the types of land uses permitted in any given section of the city. In coming up with the three scenarios, the city and its economic development partners considered the topographic and geological challenges of the hilly site (roughly 120 acres are developable); the market feasibility of particular land uses; and community input provided in 2019 during the Allentown Vision 2030 comprehensive planning process. They also weighed various options for site access, seeking to avoid increasing traffic on residential streets while also searching for a viable entry point besides the main one on Hanover Avenue. As for the site's distinctive boulevard entrance, planners considered the pros and cons of maintaining the road alignment. _______________ **As of November 22, 2019 This project has not yet been awarded. A timeline for award has not yet been established.** The Project consists of: Demolition Allentown State Hospital: demolition of 44 buildings/structures on approximately 200 acres, hazardous materials abatement, utility termination, site restoration, historical salvage, design documents. ESTIMATED RANGE: Over $10,000,000.00 Liquidated Damages = (.1) $3,750.00 per day. Duration: 546 Calendar Days from the Initial Job Conference Mailed proposals must be received by the Department of General Services on the 2nd Floor of the Arsenal Building, 1800 Herr Street, Harrisburg, PA, prior to the Proposal Submission Deadline Date and Time regardless of method of delivery used. No proposal shall be considered if it arrives after the Proposal Submission Deadline, regardless of reason for the late arrival. All envelopes containing proposals must be clearly marked "PROPOSAL" and must include the address of the Proposal Submission location, the assigned contract, the proposer's name, address, project name, project number and the Proposal Submission Deadline Date and Time. Mailed proposals include proposals submitted through the United States Postal Service or through an express mail service. If the prospective proposer chooses the USPS as the method of delivery, please note that the USPS does not deliver directly to the Department of General Services, it is delivered to a processing area. Therefore, please allow an additional seven (7) calendar days for delivery. Proposals delivered in person by the proposer or through an authorized representative will be received by the Department of General Services, on the Third Floor of the Arsenal Building, 1800 Herr Street, Harrisburg, PA from individuals presenting picture identification and providing evidence of his/her authorization from the proposer to deliver the proposal on behalf of the proposer, no later than the Proposal Submission Deadline.

Post-Bid

Medical

$10,000,000.00

Public - State/Provincial

Demolition, LEED Certification, Site Work

59

25

10

4

Subscribe For Documents

91 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Quality Control, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Sanitary Facilities, Construction Aids, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Steel Joist Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Wood Framing, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Fire and Smoke Protection, Applied Fireproofing
Division 08 - Openings

Division 08 - Openings

Windows, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions, Fireplaces and Stoves, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers, Canopies
Division 11 - Equipment

Division 11 - Equipment

Healthcare Equipment, Examination and Treatment Equipment, Treatment Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Portable Lamps, Lamps, Furniture, Seating, Chairs, Systems Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping, Fire Suppression Systems Insulation, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping, Fire-Suppression Water Storage, Storage Tanks for Fire-Suppression Water, Underground Storage Tanks for Fire-Suppression Water
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Potable-Water Storage Tanks, Facility Storm Drainage, Roof Drains, Plumbing Fixtures, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Gas Storage Tanks for Laboratory and Healthcare Facilities
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, Facility Fuel Systems, Facility Fuel-Storage Tanks, Facility Underground Fuel-Oil, Storage Tanks, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Geotechnical Instrumentation and Monitoring of Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Fuel Distribution Utilities, Natural-Gas Distribution, Fuel-Storage Tanks, Aviation Fuel-Storage Tanks, Compressed Gases Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation, Guideways/Railways, Rail Tracks
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment, Packaged Water Treatment, Packaged Water Treatment Plants
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation

Find More Local Projects

Within 75 Miles of This Project
390
Active Projects
222
Bidding Soon
3,245
All Active Projects
1,564
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFP D/B - Allentown State Hospital Demolition of Buildings/Structures

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.