Site work and new construction of a municipal facility in Norristown, Pennsylvania. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

https://www.bizjournals.com/philadelphia/news/2021/12/20/mm-partners-proposes-31m-mixed-use-development-in.html In June, Montgomery County broke ground on a new $415 million Justice Center that involves three phases that will be developed over the next five years and play a consequential role in ongoing efforts to revitalize Norristown. The project involves constructing a six-story, 330,000-square-foot justice center that will be connected to the existing courthouse, reconstructing Hancock Square and expanding the green space to 113,000 square feet from 40,000 square feet, and renovating the current historic courthouse. The undertaking is significant on several fronts. Montgomery County's capital improvement program for the years 2021 through 2025 includes $800 million of projected spending, and the Justice Center accounts for nearly half of that amount. It stands as the largest five-year capital project in the county's history and is primarily being funded through bond proceeds. The project is also among the largest courthouse-justice center developments under construction in the country. _____________________________________________________________________________________________________________________________ Specification 6429 - Justice Center Phase #1 - GC Specification 6430 - Justice Center Phase #1 - MC Specification 6431 - Justice Center Phase #1 - EC Specification 6432 - Justice Center Phase #1 - PC Questions Due Date: Jan 19th 2021, 6:00 PM EST The total value of phase 1 is estimated at $12M. Bid Result - Justice Center Construction - Phase #1 - PC Guy M Cooper $104,000 - Justice Center Construction - Phase #1 - MC Guy M Cooper $90,000. Justice Center Construction - Phase #1 - GC DAngelo Bros., Inc $13,661,890 Justice Center Construction - Phase #1 - EC Electri-Tech, Inc $960,000. Awarded Justice Center Construction - Phase #1 - GC P. J. Dick Incorporated $8,252,675.00 Justice Center Construction - Phase #1 - PC Guy M Cooper $104,000 - Justice Center Construction - Phase #1 - MC Guy M Cooper $90,000. Justice Center Construction - Phase #1 - EC Electri-Tech, Inc $960,000.

Under Construction

Municipal

$9,406,675.00

Public - County

New Construction, Site Work

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Temporary Access Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Demonstration and Training, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Surveys, Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Joint Protection, Preformed Joint Seals, Joint Fillers, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Exterior Specialties, Protective Covers, Canopies
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Storm Drainage, Sump Pumps, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Flexible Connectors, Air Outlets and Inlets, Decentralized HVAC Equipment, Radiant Heating Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Shoring and Underpinning, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors, Tunneling and Mining, Shaft Construction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
466
Active Projects
247
Bidding Soon
4,087
All Active Projects
1,976
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2021

April 19, 2021

img_map_placeholder

2 E Airy St, Norristown, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Montgomery County Campus - Phase 3 - Justice Center - Phase 1 Package

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.