BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Honolulu, Hawaii. Completed plans call for the renovation of a municipal facility.

A general contractor has been selected. Construction is expected to begin in quarter three of 2019. Mobilization and demobilization. Miscellaneous material removal and disposal. Other related miscellaneous and appurtenant work, including restoration work, required to complete the project in accordance with the drawings and specifications. These specifications are divided for convenience into titled divisions and section as set forth in the TABLE OF CONTENTS preceding these specifications and shall not be considered an accurate or complete segregation of the several units of labor and materials. No responsibility, either direct or implied, is assumed by the City and County for omissions or duplications of the subject matter. The Contractor will be held responsible for the complete work whenever or wherever the parts are described in one or more trades. Any mention in these section or indication on the drawings of articles, materials, operations, or methods, require that the Contractor furnish each item so mentioned or indicated, of the kind, type, or design and quality of each item so mentioned or indicated on the drawings, and that the Contractor furnish all labor, materials, equipment, incidentals and supervision necessary to complete the work in accordance with the drawings and the true meaning and intent of these specifications, even though such mention of articles, materials, operations, methods, quality, qualifications, or conditions is not expressed in complete sentences. Where devices or items, or parts thereof are referred to in the singular, it is intended that such references shall apply to as many such devices, items, or parts as are required to properly complete the work. Schedule of work include in these specification sections are given for convenience and shall not be considered as a comprehensive list of items necessary to complete the work of any section. The Contractor shall employ the usual standard practice of coordinating the work in each section with the work of other sections. The necessary information and the items, accessories, anchors, connections, patterns, templates, etc. shall be delivered when required, in order to prevent any delay in the progress and completion of the work.

Award

Municipal

$1,003,000.00

Public - County

Renovation

39

17

2

15

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
3
Bidding Soon
89
All Active Projects
44
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2019

August 5, 2019

img_map_placeholder

151 Kapahulu Ave, Honolulu, HI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.