BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2019 at 8:00 PM

Updated March 16, 2024

Site work and paving for a civil project in Phoenix, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

A general contractor has been selected for this project. Construction is currently underway. The City of Phoenix on behalf of Civil & Environmental Consultants, Inc., is seeking a qualified construction contractor to perform the project The scope of work will include construction of Baseline Road between 57th Avenue and the 202 Freeway that is currently under construction. Engineers Estimate: $2 M to $2.5 M The scope of work will include construction of Baseline Road between 57th Avenue and the 202 Freeway that is currently under construction. The length of new roadway construction is 2,040 linear feet extending west from 57th Avenue. New roadway construction will consist of paving, medians, curb & gutter, sidewalk, scuppers, spillways, temporary retention basins, landscaping, streetlights, traffic signal at the intersection of 59th Avenue and Baseline Road, driveways, right-turn deceleration lanes, bus stops, public sewer main extension, public water main extension, domestic and landscape water taps, private fire line taps, private sewer line taps, and dry utility conduit for streetlights, Cox communications and CenturyLink. In addition, Southwest Gas service extensions and mainline extensions will also need to be constructed as part of this project, however the work will be done by Southwest Gas and this portion will only be coordination efforts. All work is shown on the plans, reports, and specifications and should be in accordance with the MAG Uniform Standard Specifications and Details for Public Works Construction and the 2015 City of Phoenix Supplements to MAG. Requests will only be honored if made within the first week of the advertising period. Please allow a minimum of seven calendar days for production. Questions pertaining to process or contract issues should be directed to George Goodale, Contracts Specialist, at george.goodale@phoenix.gov

Under Construction

Roads / Highways

$3,155,200.00

Public - City

Paving, Site Work

69

1

24

11

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
46
Bidding Soon
1,216
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2019

March 25, 2019

Project location map

Multiple Locations, Phoenix, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.