BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a civil project in Brampton, Ontario. Design plans call for paving for a road / highway; and for site work for a water / sewer project.

Project 14-1256 Zone 5 sub-transmission main project to be build along Williams Parkway. Scope involves the east to west connection of two parallel water systems. Construction will be phased. TIMELINE: Project is in detailed design stages. Tender and construction timelines for Contracts 3 + 4 have not yet been finalized. Further update may be available fall 2026. Budget is an estimate. GHD is the Value Engineering Firm. See related project - West Brampton Watermain Project 14-1256, Contracts 1 + 2.

Design

Water / Sewer

$50,000,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
858
Active Projects
538
Bidding Soon
5,409
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2027

Project location map

Williams Pkwy, Brampton, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.