BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Des Moines, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

For consideration by the City Council (Council) at its meeting on February 11, 2019. The City of Des Moines (Jurisdiction) reserves the right to reject any and all bids. The City of Des Moines is pleased to provide accommodations to individuals with disabilities or groups and encourages participation in City government. To better serve you, please notify us at least three business days in advance when possible at 515-283-4209, should special accommodations be required. Work on each improvement shall be commenced upon approval of the contract by the Council, and completed as stated. Each bidder shall accompany its bid with bid security as defined in Section 26.8 of the Iowa Code and as specified by the Jurisdiction. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. The bidder should not include sales tax in the bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. Fleur Drive Reconstruction from George Flagg Parkway to Watrous Avenue, Phase 1 Northbound Lanes, 06-2017-014 The improvement includes reconstructing the northbound lanes of Fleur Drive with Portland Cement Concrete (PCC) curb and gutter, 9-inch Hot Mix Asphalt (HMA) paving, 12-inch modified subbase, 3-inch milling with HMA paving, PCC sidewalk and driveways, retaining walls, storm sewer, subdrain, earthwork and grading, fencing, water main construction, new irrigation system, erosion control, and restoration; all in accordance with contract documents, including Plan File Nos. 606-001/372, located along Fleur Drive from Watrous Avenue to George Flagg Parkway, Des Moines, Iowa. This project shall be fully completed not later than September 18, 2020 and in accordance with the Completion Provisions.

Under Construction

Roads / Highways

$7,388,888.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
39
Bidding Soon
445
All Active Projects
239
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2019

April 1, 2019

img_map_placeholder

Fleur Dr., Des Moines, IA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.