Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 20, 2020 at 7:00 PM

Updated September 14, 2023

Renovation of a municipal facility in Des Moines, Iowa. Completed plans call for the renovation of a municipal facility.

The improvement includes the replacement of the existing HVAC system with a more energy efficient system that maintains temperature and humidity to the facility. Includes HVAC mechanical systems, electrical connections, structural modifications, roof repair, and utility connections; all in accordance with the contract documents, including Plan File Nos. 605-046/052 This project shall be fully completed not later than October 31, 2019. This project shall be fully completed not later than October 31, 2020. Engineer's Construction Estimate. $420,000.00 DBE/TSB Goal is 5.94%

Award

Municipal

$441,000.00

Public - City

Renovation

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
46
Bidding Soon
740
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2020

February 13, 2020

Project location map

3226 University Ave, Des Moines, IA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed