BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Encinitas, California. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work consists of clearing and grubbing, new concrete sidewalks, new pedestrian ramps, concrete driveways, concrete curb & gutter, storm drainpipes, install Class II Aggregate Base, asphalt concrete, asphalt berms, install bioswales, vegetated swales, PCC bike path, retaining walls, traffic signal modifications, and traffic striping along Santa Fe Drive. The Contractor shall complete the proposed work in its entirety. Should any detail or details be omitted from the Contract Documents which are essential to its functional completeness, then it shall be the responsibility of the Contractor to furnish and install such detail or request such details from the City Engineer so that upon completion of the proposed work, the work will be acceptable and ready for use. Engineer's Estimate (Base Bid) - $2,122,000 DISADVANTAGED BUSINESS ENTERPRISE GOAL: 12% The Contractor shall diligently prosecute the work to completion within one hundred twenty (120) working days from the commencement date contained in the Notice to Proceed. The City will answer information requests on this project up to 2:00 PM on Monday, March 20,2023. All questions regarding this project shall be submitted through PlanetBids. All project correspondence will be posted on the PlanetBids website. It is the responsibility of the Bidders to check the website regularly for information updates, clarifications, and addenda. The City reserves the right to reject all bids at its sole discretion and to waive any immaterial irregularities or informalities in the bids received. The successful bidder will be required to furnish a Payment Bond for one hundred percent (100%), and a Performance Bond for one hundred percent (100%) of the contract amount prior to execution of the contract.

Final Planning

Roads / Highways

$2,122,000.00

Public - City

Paving, Site Work

55

14

3

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
130
Bidding Soon
2,110
All Active Projects
972
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2023

June 2, 2023

img_map_placeholder

Santa Fe Dr, Encinitas, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.