BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2019 at 8:00 PM

Updated March 18, 2026

Renovation of an educational facility in Plattsburgh, New York. Completed plans call for the renovation of a educational facility.

As of March 11,2019 project is expected to be completed in October 2020. The Board of Trustees of Clinton Community College, Plattsburgh, New York 12901, hereby invites submission of sealed bids for the following project: Clinton Community College Moore Building Renovation Aes Project No. 4644A Project Description: Complete the exterior renovation of the Moore Academic Building including, but not limited to: existing stucco removal/new cement board and exterior insulation and finish system (EIFS) (over the entire 5 story building); reconstruction of east and west veranda stairs, replacement of all exterior doors, windows and exterior railings; reconstruction of loading dock; reconstruction of northwest exterior stairs; repaving of Moore Building driveway and other associated work (including some hazardous material abatement). The project also includes, but is not limited to: installation of air conditioning on floors one through four (not 5th) including associated electrical and plumbing work; and renovation of the President's Suite. The project shall be completed in phases in accordance with the Construction Milestone Schedule, and the Owner requires the Project to be substantially complete on or before October 31, 2020; and final completion on or before December 31, 2020. Contractors are required to examine the project and site conditions. Bids shall be submitted on the provided forms in accordance with the Instructions to Bidders. Each bid must be accompanied by a security deposit in the amount of 5% of the Bid. The successful bidder shall be required to furnish 100% performance bond and 100% payment bond. The project will be bid and awarded with four (4) Prime Contracts: General Construction (GC); Plumbing (P); Mechanical (M); and Electrical (E). The Board of Trustees reserves the right to waive any informality in or to reject any and all parts of bids at their sole discretion. A Non-Collusion Certificate must accompany the bid. Contractor's bids are irrevocable for period of (45) days after submission. The Board of Trustees intends to award the contracts by mid-March 2019. Bid Result:- CONTRACT (GC) "Murnane Building Contractors, Inc $5,675,000" CONTRACT (M) "L.H. LaPlante Co $314,000" CONTRACT (P) "Pipeline Mechanical of Plattsburgh, LLC $60,000" CONTRACT (E) "S & L Electric $139,500" Total:-6,188,500

Award

Educational

$5,675,000.00

Public - County

Renovation

177

30

56

6

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
12
Bidding Soon
1,943
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2019

May 20, 2019

Project location map

136 Clinton Point Dr, Plattsburgh, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.