BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Fort Pierce, Florida. Contact the soliciting agency for additional information.

Supply, one (1) annually, over a six year period, approximately six (6), 69 kV Power Transformers to Fort Pierce Utilities Authority (FPUA) as required and provide a manufacturer's field service engineer to perform Special Services including assembly, installation, testing, oil filling, inspection and commissioning. Transformers shall be furnished complete with special requirements and services detailed in the specifications. Delivery of transformers to various FPUA facility locations. FPUA is upsizing from existing substation power transformers. The existing substation power transformers are not the same age, some are close to the same age but others are quite different in age. There are two (2) power transformers at each Substation site. The existing substation power transformer pads are in good shape and no modifications are needed, and there are no access issues at any of the Substation locations. No Pre-Proposal Conference is planned.

Post-Bid

Power Plant

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
109
Bidding Soon
1,435
All Active Projects
580
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 16, 2019

September 16, 2019

img_map_placeholder

Multiple Locations, Fort Pierce, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.