BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of an educational facility in Charlotte, North Carolina. Completed plans call for the demolition of a educational facility; for site work for a educational facility; for the construction of a educational facility; and educational facility.

Moore Hall Demolition is underway, to complete Oct.8, 2019 - Environmental Holdings Group (EHG) is the contractor. Contract Amount: $2.5M + Change Order Amount: $1M = Total Contract Amount: $3.5M Phase XVI - bid currently advertised, prequalified contractors posted here: http://facilities.uncc.edu/advertisements Construction phase: Oct.9, 2019 - May 31, 2021 Total Construction Contract with CM@Risk (Edifice): $43.4M Residence Hall Phase XVI - requires advance planning, design and construction administration services for demolition of Sanford & Moore Halls and the construction of a new 750-800 bed complex in a two phase construction and demolition schedule for the entire site over two years. The proposed room configuration will be double rooms supported by communal bathrooms. The complex shall be designed and built using LEED or Green Globes elements. Each floor will include lounges and laundry rooms, and wireless internet access in the student rooms, common areas, lounges and multi-purpose rooms. Trade packages: 01A Final Cleaning, 03A Concrete, 04A Masonry, 05A Structural/Misc Steel, 06A Millwork, 07A Waterproofing, 07B Roofing, 07C Fireproofing, 08A Doors/Frames/Hardware, 08B Aluminum Storefront/Windows, 08C Coiling Doors/Grilles/Dock Lift, 09A Drywall/Metal Framing, 09B Acoustical Assemblies, 09C Flooring, 09D Hard Tile, 09E Painting, 09G Epoxy Flooring, 10A Specialties, 10B Signage, 10C Glass Canopies, 10D Metal Canopy, 12A Window Treatments, 12B Lab Casework/Fume Hoods, 14A Elevators, 21A Fire Protection, 22A Plumbing, 23A HVAC, 23b TAB, 26A Electrical, 27A Communications, 32A Hardscapes/Site Furnishings, and 32B Landscaping/Irrigation.

Post-Bid

Educational

$43,400,000.00

Public - State/Provincial

Demolition, LEED Certification, New Construction, Site Work

375

44

74

5

Subscribe For Documents

146 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
43
Bidding Soon
1,098
All Active Projects
464
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2019

October 23, 2019

img_map_placeholder

9201 Alumni Way, Charlotte, NC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.