Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Tucson, Arizona. Completed plans call for the renovation of a 10,500-square-foot, nine-story above grade municipal facility.
Bids may be based on a shorter schedule. If the bid is based on fewer calendar days to completion, the low responsive, responsible bidder must submit a copy of its proposed Critical Path Method (CPM) schedule preferably in Microsoft Project^, to which the County will add a three (3) percent grace period to establish the completion date, as provided in the Contract. Barring unforeseen circumstances, award to the responsible bidder submitting the low responsive bid, and execution of contract is expected within 8 weeks of the opening date. SBE Goal: A minimum goal of (2%) for participation by Small Business Enterprises (SBE) as a percentage of Base Bid has been established for this project (Base Bid is defined as the sum of the Base Bid Amount). SBE documents included at the end of this solicitation contain forms that must be fully completed and included with bids. All bidders must hold a valid license issued by the State of Arizona Registrar of Contractors and maintain same throughout the duration of the contract term. Failure to maintain said license may be grounds for default of the contract and subsequent termination. The project consists of complete renovation of approximately 10,600 sf first floor suite for Development Services in the Public Works Building located at 201 N. Stone Ave, Tucson, Arizona, 85701. Existing first level space for Development Services will be completely renovated to move from an enclosed office style space to an open office scheme with strategically located enclosed rooms, project includes all new architectural finishes, branch electrical service and lighting, and reworked mechanical distribution. All work is to be completed pursuant to the Construction Documents prepared by Pima County Facilities Management Department, dated December 12, 2018, which are attached herein. The total construction cost of this project is estimated at $1,000,000 to $1,400,000. All work for the project is to be completed in 210 calendar days from the date of Notice to Proceed. Bids must be accompanied by an original bid guarantee of ten percent (10%) of the total bid amount. Pima County accepts the forms of bid guarantee provided in A.R.S. ^ 34-201(A) (3).
Award
Municipal
$1,167,700.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock Winning Bids!
Elevate your business with the premier source for commercial construction data. Gain instant access to up to five free projects and companies, and discover a treasure trove of opportunities. Subscribe now for comprehensive access to all contacts, documents, and vital details, and set yourself up to win more business than ever before!
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
February 14, 2019
April 15, 2019
201 N Stone Ave, Tucson, AZ
Related To This Project
Tucson, AZ
Bid Date: Sep 18 2019
Tucson, AZ
Bid Date: Sep 19 2019
Tucson, AZ
Bid Date: Sep 19 2019
Tucson, AZ
Bid Date: Mar 28 2024
Tucson, AZ
Bid Date: Mar 05 2024
Tucson, AZ
Bid Date: Feb 28 2024
Tucson, AZ
Bid Date: Feb 29 2024
Tucson, AZ
Bid Date: Aug 18 2020
Tucson, AZ
Bid Date: Jul 21 2020
Tucson, AZ
Bid Date: Jul 30 2024
Tucson, AZ
Bid Date: Feb 16 2024
Tucson, AZ
Bid Date: May 07 2024
Tucson, AZ
Bid Date: Feb 20 2024
Tucson, AZ
Bid Date: Feb 16 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--