Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a civil project in San Francisco, California. Completed plans call for the construction of a water / sewer project.
Sundt/Walsh, A Joint Venture, has selected the following subcontractors as successful proposers for the Scope III New Headworks construction. Scope 3-01 – Survey – KCA Engineers, Inc. Scope 3-05 – Potholing – Azul Works, Inc. Scope 3-06 – Site Services – Your All Day Everyday Janitorial Services Scope 3-08 – Site Security – A1 Protective Services, Inc. Scope 3-05 – Trade Resource Reporting – EYRUS Scope 3-10 – Traffic Control Maintenance – Marinship Development Interest LLC Scope 3-11 – Tower Cranes – Bigge Crane and Rigging Co. Scope 3-12 – Demolition – W.C. Maloney, Inc. Scope 3-13 – Structural Concrete – Walsh Group Subject to conditions prescribed by the City and County of San Francisco, CA responses to this bid request are sought from subcontractors for Survey, Dust Control, Street Sweeping, SWPPP and Inspections, Potholing, Site Services and Safety Railing, Temp Fencing, Site Security, Trade Resource Reporting System, Traffic Control and Flagging, Tower Cranes, Demolition of Remaining Headworks, Structural Concrete, Shoring-Dewatering-Excavation and Haul Off, Drilled Shafts and Inclinometers, Underslab Piping-Yard Pipe-Storm Drains and Manholes. PROJECT DESCRIPTION: The intent of this project is to replace the existing Headworks Facility at the SE Water Pollution Control Plant with a new all-weather 250 MGD Headworks Facility. This solicitation is for Scope III New Headworks Construction. SCOPE / DRAWINGS: The drawings for Scope III are included in the Plan Room on Smartbidnet.com. The scopes being sought for this project are as follows: 3-1 - Survey - 60% LBE Requirement 3-2 - Dust Control - 60% LBE Requirement 3-3 - Street Sweeping - Concrete Pads, Demo, Bollards - 60% LBE Requirement 3-4 - SWPPP Inspections- 60% LBE Requirement 3-5 - Potholing - 20% LBE Requirement 3-6 - Site Services and Safety Railing - 60% LBE Requirement 3-7 - Temp Fencing - 60% LBE Requirement 3-8 - Site Security - 60% LBE Requirement 3-9 - Trade Resource Reporting System - 0% LBE Requirement 3-10 - Traffic Control / Flagging - 60% LBE Requirement 3-11 - Tower Cranes - 0% LBE Requirement 3-12 - Demolition of Remaining Headworks - 20% LBE Requirement 3-13 - Structural Concrete (including rebar) - 20% LBE Requirement 3-15 - Shoring, Dewatering, Excavation and Haul Off - 20% LBE Requirement 3-16 - Drilled Shafts and Inclinometers - 20% LBE Requirement 3-17 - Underslab Piping, Yard Pipe, Storm Drains and Manholes - 20% LBE Requirement PROJECT SCHEDULE: Currently this work is scheduled to commence in the Winter of 2019. LOCAL BUSINESS ENTERPRISE (LBE) REQUIREMENTS: The following project-wide LBE participation requirement is: LBE-15%. Each Bid Package has a specific LBE requirement as indicated above. Any proposals that fail to meet the Bid Package LBE requirement will be deemed non-responsive. DISADVANTAGED BUSINESS ENTERPRISE (DBE) REQUIREMENTS: All subcontractors are hereby notified that it is expected that work to be performed under this contract will be in full or in part financed by the Clean Water State Revolving Fund (SRF), administered by the United States Environmental Protection Agency (US EPA) and the State Water Resources Control Board (SWRCB). Bidders shall comply with all applicable terms and conditions, special provisions, and reporting requirements, as set forth in these specifications, and as may be required by federal law, rule, or regulation. Additionally, meeting the project-wide Fair Share Objective is encouraged: MBE-6.4%, WBE-2.0%. Refer to Contract Section 00 48 10.01, ¶2 for more information. Confidentiality of the information provided will be respected to the extent permitted by law. QUESTIONS: Direct all project specific questions to David Cooley at Sundt/Walsh. All questions should be submitted via e-mail. The e-mail address is Dcooley@sundt.com.
Award
Water / Sewer
$225,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 15, 2019
October 4, 2019
1800 Oakdale Ave, San Francisco, CA
Related To This Project
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
Bid Date: Oct 22 2020
San Francisco, CA
Bid Date: Feb 14 2019
San Francisco, CA
Bid Date: Nov 13 2018
San Francisco, CA
Bid Date: Nov 16 2017
San Francisco, CA
Bid Date: Nov 19 2014
San Francisco, CA
--
San Francisco, CA
Bid Date: Apr 11 2019
San Francisco, CA
Bid Date: Mar 07 2019
San Francisco, CA
Bid Date: Mar 28 2019
San Francisco, CA
Bid Date: Jun 13 2019
San Francisco, CA
Bid Date: Jul 11 2019
San Francisco, CA
Bid Date: Aug 29 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.