BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 25, 2026 at 8:00 PM

Updated July 7, 2026

Site work, paving and outdoor lighting for a mixed-use development in Seattle, Washington. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

This project will add double-tracking rail lines on three segments of our track: - Near Tacoma Dome Station, between where the ST-owned track branches off from the BNSF-owned Railroad (Tacoma Rail Junction) and Portland Avenue. - Between South Pine Street and South 66th Street in South Tacoma, including a possible replacement of the South 66th Street bridge. - Between Lakewood and DuPont. (Note that Sounder service will be extended here by 2045.) As of June 25, 2026, this project is still in the conceptual planning phase. Further information regarding a design firm and timeline for construction has not yet been established.

Conceptual

$550,000,000.00

Public - State/Provincial

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
271
Active Projects
34
Bidding Soon
2,047
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.