Site work and paving for a transportation facility in Reno, Nevada. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

**As of April 22, 2019, this project has not been awarded yet. A timeline for award is not yet established. Project No. : 2018-042, 31-18 In accordance with the plans and specifications, the project consists of demolition of approximately 103,000 SY existing asphalt pavement, construction of approximately 71,000 SY of new asphalt pavement, removal and reconfiguration to replace 5,000 SY Portland Cement Concrete pavement, placement of 5,000 SY of rock mulch, removal and installation of 200 Runway Edge Lights, Construction of a new 2,500 SF Airfield Lighting Vault Building, demolition of existing Lighting Vault Building, and miscellaneous striping, electrical, drainage, and other related items for project completion. All bids shall be accompanied by a cashier's or certified check payable to the order of the Reno-Tahoe Airport Authority amounting to not less than ten percent (10%) of the bid, or by a bond in said amount and payable to said Owner signed by the bidder and a corporate surety. Said check shall be forfeited or said bond shall become payable to said Owner in case the bidder depositing the same does not, within ten (10) days after written notice that the Contract has been awarded to him: (a) enter into a Contract with the Owner, and (b) furnish certificates of insurance, a bond of faithful performance and a payment bond as described in the Contract Documents. The contractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate. The above assurance must be included in each subcontract the prime contractor signs with a subcontractor. This contract will be funded in part by a grant from the Federal Aviation Administration, therefore the requirements of Title 49 CFR Part 26, Participation by Disadvantaged Business Enterprises in Department of Transportation Programs, applies to this contractThe RTAA has not set a DBE participation contract goal for this project; however, the RTAA has set an SBE goal of 14.0% for the project. SBE participating firms must be certified as small businesses by the Nevada Unified Certification Program ("NUCP") prior to bid submission. Please note that all firms certified as DBEs are also SBEs and may be counted towards the SBE goal. Failure to meet the goal or make good faith efforts to meet the goal may render a bidder non-responsive. SBE participants must be listed in the bid as instructed. DBE participation is encouraged to assist the RTAA in meeting its overall DBE program goal. The successful consultant will be required to submit reports providing information on DBE/SBE sub consultants as specified in the contract. 1. The Offeror or Bidder's attention is called to the "Equal Opportunity Clause" and the "Standard Federal Equal Employment Opportunity Construction Contract Specifications" set forth herein. 2. The goals and timetables for minority and female participation, expressed in percentage terms for the contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows: Timetables Goals for minority participation for each trade: 8.2% Goals for female participation in each trade: 6.9% These goals are applicable to all of the contractor's construction work (whether or not it is Federal or federally-assisted) performed in the covered area. If the contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the contractor also is subject to the goals for both its federally involved and non-federally involved construction. Questions regarding the project should be addressed in writing to: Mr. Brian Martinezmoles, P.E., Wood Rodgers, Inc. at the above address. Project estimate $10 million - $20 million.

Bid Results

Transportation Terminals

$13,769,846.00

Public - City

Paving, Site Work

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
32
Bidding Soon
481
All Active Projects
227
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 21, 2019

April 22, 2019

August 15, 2019

img_map_placeholder

2001 E Plumb Ln, Reno, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.