BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2020 at 8:00 PM

Updated November 15, 2023

Site work for a civil project in Reno, Nevada. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

This proposal to the Owner is irrevocable for a period of sixty (60) days after the date of the bid opening. NATIONAL ID: NV10576; NEVADA ID: J-756 The Project involves the construction of a 2,000 Acre-foot lined, treated effluent storage reservoir located at the Tahoe Reno Industrial Center, with site grading of the surrounding parcels. The reservoir will be the terminus of the TMWRF Effluent Pipeline. The reservoir will be singlelined with a 60-mil HDPE liner. The existing dam will be raised approximately 13 feet to allow for greater storage of effluent. The reservoir outlet pipe below the dam requires the dam to be excavated to install the casing and carrier pipe. No trenchless technologies are allowed for the outlet pipe installation. Effluent piping from the TRIGID WWTF and TMWRF will be installed with the project, as well as an Induction Well pipe for future use. Multiple culverts will be installed to accommodate local drainage from upstream developments. Safety features and approximately 7,450 linear feet of permanent fencing are included in the project. The Engineer's Opinion of Probable Construction Costs for this project is $18,000,000.00. For questions regarding this project, and for complete contract requirements, contact: Keith Karpstein, P.E.; 775-851-4788; kkarpstein@farrwestengineering.com

Award

Water / Sewer

$12,614,921.00

Public - City

Site Work

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
22
Bidding Soon
385
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2020

May 25, 2020

Project location map

515 Double Eagle Ct, Reno, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.