Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 3, 2020 at 7:00 PM
Updated November 15, 2023
Site work for a civil project in Reno, Nevada. Completed plans call for site work for a road / highway; and water / sewer project.
**As of December 03, 2020, the construction is expected to begin next month and the Contractor has 580 calendar days to be substantially complete. This proposal to the Owner is irrevocable for a period of ninety (90) days after the date of the bid opening. The Project consists of installation of approximately 15.4 miles of 24-inch diameter ductile iron effluent water main. Effluent main originates at the Truckee Meadows Water Reclamation Facility and ends east at the Tahoe-Reno Industrial Center. Project components includes mass grading, 500,000-gallon tank, rock excavation, rock blasting, storm drain culverts, jack and bore, microtunneling, control vaults, electrical improvements, asphalt pavement, gravel restoration and hydroseeding. The Engineer's Opinion of Probable Construction Costs for this project is $35,000,000.00. Construction duration is 550 calendar days and is to commence in October 2019. The Public Works Project No. is LY-2019-259. Project shall comply with state prevailing wage requirements. All bidders must register as a plan holder in the Farr West Bid Room in order to receive addenda and updates for the project. For questions regarding this project, and for complete contract requirements, contact: Chuck Reno, P.E.; 775-851-4788; chuck@farrwestengineering.com. No. 3680875
Award
Water / Sewer
$31,675,174.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 5, 2020
January 4, 2021
Multiple Locations, Reno, NV
Related To This Project
Reno, NV
Bid Date: Jan 07 2021
Reno, NV
Bid Date: Aug 05 2019
Reno, NV
--
Reno, NV
Bid Date: Aug 11 2023
Reno, NV
Bid Date: Aug 15 2023
Reno, NV
Bid Date: Aug 03 2023
Reno, NV
Bid Date: Mar 24 2020
Reno, NV
Bid Date: Sep 05 2023
Reno, NV
Bid Date: Aug 02 2023
Reno, NV
Bid Date: Aug 31 2023
Reno, NV
Bid Date: Aug 03 2023
Reno, NV
Bid Date: Oct 11 2021
Reno, NV
Bid Date: Aug 07 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
