BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2019 at 8:00 PM

Updated February 13, 2024

Site work for a water / sewer project in Whittier, California. Completed plans call for site work for a water / sewer project.

The work to be performed consists of removal and replacement of the existing sewer main, manholes, and laterals, and appurtenant work, in accordance with the project plans as specified hereinafter, project specifications as specified hereinafter for the Whittier Utility Authority, Los Angeles County, State of California, and in accordance with the Standard Specifications for Public Works Construction (Greenbook), 2015 Edition. Contractor shall furnish all necessary labor, tools, materials, appliances, and equipment to complete the project and be responsible for obtaining a no fee excavation permit(s) for the project from the City of Whittier, Public Works Department. The Contractor shall commence ordering all necessary materials within ten (10) calendar days after notification that the contract has been executed and shall be completed within sixty (60) working days after date set forth in the Notice to Proceed. Each bid shall be made on the proposal form furnished by the Whittier Utility Authority herewith and shall be in accordance with the plans, specifications and other contract documents and shall be accompanied by a certified check, cashier's check or bidders' bond, payable to Whittier Utility Authority in a sum not less than ten percent (10%) of the amount of the bid, as a guarantee that the bidder will enter into the contract for the work, the full amount of such guarantee to be forfeited to Whittier Utility Authority should said bidder fail to enter into said contract. The successful bidder will be required to furnish a Faithful Performance Bond in the amount of not less than one hundred percent (100%) of the contract price, a Labor and Material Bond in an amount of not less than one hundred percent (100%) of the contract price, said bonds to be secured from a surety company authorized to do business in the State of California, and to be subject to the approval of the City Attorney. The Contractor will also be required to furnish a certificate that he/she carries compensation insurance covering his/her employees upon work to be done under this contract, which may be entered into between him/her and Whittier Utility Authority for the said work.

Award

Water / Sewer

$1,236,000.00

Public - City

Site Work

11

4

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
615
Active Projects
290
Bidding Soon
3,415
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2019

May 27, 2019

Project location map

Hadley St, Whittier, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.