BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.

The purpose of this project, along with project W20017, W20028, and W20029, is to protect an estimated 62 structures from the one percent annual probability floodplain along the Menomonee River in the Western Milwaukee corridor. These projects are a component of the Phase II Watercourse Management Plan for the Menomonee River Watershed, which identified overbank flooding in the vicinity of West State Street on the west side of Milwaukee. This project will complete the levee system in the corridor that starts just west of Hart Park at West State Street at the upstream end and extends east to US Highway 175. The project scope is to design and construct a continuation of the floodplain levee and floodwall along West State Street, east from the N. 59th and State Pump Station to tie in to high ground just east of the USH 175 overpass. Approximately 2,000 feet of earthen levee and 1,200 feet of floodwall will be designed and constructed under this project, as well as 360 feet of 90" storm sewer with inlet and outlet structures. The increase in total project cost is due to additional planning level labor costs to reflect additional survey effort and an updated cost estimate to both complete a levee and floodwall system between 59th and State and the existing levee at the former Central Redi-Mix site, and to address flood risk reduction for nine structures no protected by the levee system. Additional O&M will be required for vegetation maintenance after the five-year maintenance schedule post-construction (estimated as 2026) occurs. This project will add additional levee and floodwall lengths to the District's infrastructure which will require inspection and maintenance, starting no earlier than 2022. As of September 17, 2024, this project is under construction.

Under Construction

Water / Sewer

$46,391,836.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
50
Bidding Soon
1,054
All Active Projects
456
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2023

img_map_placeholder

To Be Determined, Milwaukee, WI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.