BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2026 at 7:00 PM

Updated February 12, 2026

Site work and paving for a road / highway in Sandy Springs, Georgia. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The I-285 Top End Express Lanes project would add two new elevated, barrier-separated express lanes in both directions on I-285, alongside regular travel lanes. As of February 11, 2026, per the owner, Procurement activities for Phase 1 are currently underway, meaning a contractor has yet to be selected. The anticipated contract award date is late 2026. Construction is anticipated to begin in 2028.

Conceptual

Roads / Highways

$5,100,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
1
Bidding Soon
1,086
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2028

Project location map

I-285, Sandy Springs, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.