BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of May 24, 2022 This project is awarded to Payne & Dolan Inc. with awarded amount of $1,620,929.20. UPDATE: https://county.milwaukee.gov/files/county/administrative-services/PSB/BudgetsCopy-1/2022-Budget/2022-Adopted-Budget/2022AdoptedCapital.pdf The Root River Parkway provides vehicle access along the Root River and connections to recreational facilities in Whitnall ParkWhitnall Park Golf Course, Whitnall Beer Garden, the Boerner Botanical Gardens, and the Wehr Nature CenterDQGcarries the Oak Leaf Trail. This section of parkway has reached the end of its useful life as indicated by the 2016 pavement rating of 30/100. It is extremely deteriorated and requires regular patch repair work in order to remain open.6WRUPVDQLWDU\sewer ZDWHUPDLQV DQG evaluation RIroadway lighting systems will be coordinated with the project. Traffic calming measures, storm water best management practices, green infrastructure, natural areas restoration and management, and connections to city streets and state highways are also included in the reconstruction plans. Widening of the roadway to accommodate special event parking, pedestrian and safety needs associated with the Whitnall Park beer garden will be incorporated. The 2019 Adopted Capital Budget included an appropriation for planning and design. The scope of work includes construction for replacement of Root River Parkway (College Avenue from Parkway to S 92nd Street) and reconstruction of the Whitnall Park Beer Garden parking lot. The parkway will be pulverized, regraded, and reconstructed including 4 inches of asphalt pavement on 8 inches minimum of stone base, concrete curb and gutter, drainage/storm sewers, and other utility replacement under new pavement. The road will be widened to acFomPodate parking. A 10' wide asphalt path will be constructed running parallel with the parkway. Storm water best management practices, green infrastructure, natural areas restoration and management shall be incorporated where applicable. Asphaltic concrete mixes used for surface course and binder course may contain salvaged/reclaimed asphaltic material. Crushed gravel base course may include crushed stone, crushed gravel, crushed concrete, reclaimed asphaltic pavement, reprocessed material or blended material. This project is included in the city's 2022-2026 Capital Improvement Plan (CIP). As of March 11, 2022, further details regarding design and construction have not been identified. _______________________________________________ Milwaukee County Department of Administrative Services is requesting proposals for professional consulting services to complete planning, design and construction documents for Root River Parkway Reconstruction The Root River Parkway Reconstruction project, a segment in College Avenue extended from the Parkway fork to South 92nd Street including the reconstruction of the Whitnall Park Beer Garden Parking lot located at 8831 S. Root River Parkway, Franklin, WI 53132 The method of contractor selection has not been determined at this time.

Award

Roads / Highways

$1,620,929.00

Public - County

Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
49
Bidding Soon
1,045
All Active Projects
443
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2022

August 22, 2022

img_map_placeholder

Multiple Locations, Milwaukee, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.