Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
As of May 24, 2022 This project is awarded to Payne & Dolan Inc. with awarded amount of $1,620,929.20. UPDATE: https://county.milwaukee.gov/files/county/administrative-services/PSB/BudgetsCopy-1/2022-Budget/2022-Adopted-Budget/2022AdoptedCapital.pdf The Root River Parkway provides vehicle access along the Root River and connections to recreational facilities in Whitnall ParkWhitnall Park Golf Course, Whitnall Beer Garden, the Boerner Botanical Gardens, and the Wehr Nature CenterDQGcarries the Oak Leaf Trail. This section of parkway has reached the end of its useful life as indicated by the 2016 pavement rating of 30/100. It is extremely deteriorated and requires regular patch repair work in order to remain open.6WRUPVDQLWDU\sewer ZDWHUPDLQV DQG evaluation RIroadway lighting systems will be coordinated with the project. Traffic calming measures, storm water best management practices, green infrastructure, natural areas restoration and management, and connections to city streets and state highways are also included in the reconstruction plans. Widening of the roadway to accommodate special event parking, pedestrian and safety needs associated with the Whitnall Park beer garden will be incorporated. The 2019 Adopted Capital Budget included an appropriation for planning and design. The scope of work includes construction for replacement of Root River Parkway (College Avenue from Parkway to S 92nd Street) and reconstruction of the Whitnall Park Beer Garden parking lot. The parkway will be pulverized, regraded, and reconstructed including 4 inches of asphalt pavement on 8 inches minimum of stone base, concrete curb and gutter, drainage/storm sewers, and other utility replacement under new pavement. The road will be widened to acFomPodate parking. A 10' wide asphalt path will be constructed running parallel with the parkway. Storm water best management practices, green infrastructure, natural areas restoration and management shall be incorporated where applicable. Asphaltic concrete mixes used for surface course and binder course may contain salvaged/reclaimed asphaltic material. Crushed gravel base course may include crushed stone, crushed gravel, crushed concrete, reclaimed asphaltic pavement, reprocessed material or blended material. This project is included in the city's 2022-2026 Capital Improvement Plan (CIP). As of March 11, 2022, further details regarding design and construction have not been identified. _______________________________________________ Milwaukee County Department of Administrative Services is requesting proposals for professional consulting services to complete planning, design and construction documents for Root River Parkway Reconstruction The Root River Parkway Reconstruction project, a segment in College Avenue extended from the Parkway fork to South 92nd Street including the reconstruction of the Whitnall Park Beer Garden Parking lot located at 8831 S. Root River Parkway, Franklin, WI 53132 The method of contractor selection has not been determined at this time.
Award
Roads / Highways
$1,620,929.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 30, 2022
August 22, 2022
Multiple Locations, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: May 12 2022
Milwaukee, WI
Bid Date: May 26 2022
Milwaukee, WI
--
Milwaukee, WI
Bid Date: May 11 2022
Milwaukee, WI
Bid Date: Apr 19 2022
Milwaukee, WI
Bid Date: May 23 2022
Milwaukee, WI
Bid Date: Feb 23 2023
Milwaukee, WI
Bid Date: Apr 25 2022
Milwaukee, WI
Bid Date: May 24 2022
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Apr 29 2022
Milwaukee, WI
Bid Date: May 17 2022
Milwaukee, WI
Bid Date: Apr 22 2022
Milwaukee, WI
Bid Date: May 23 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.