Site work and paving for a civil project in Palos Park, Illinois. Design plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
As of May 24, 2022, a design firm has been selected. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: This project may contain Federal Funds. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project, and all sub-consultants the prime Consultant will be using are scheduled to attend an initial meeting on May 1, 2019 at 1:00 P.M. at the Region One/District One Office in Schaumburg. Phase II engineering services are required for the preparation of plans, specifications and estimates for the reconstruction and drainage project along IL-7 from 131st Street to 135th Street, in Orland Park and Palos Park in Cook County. The purpose of the project is to address the flooding incidents along IL-7 with drainage and roadway improvements that will increase the level of flood protection and reduce the occurrence of roadway flooding. The following structures are included in this project: o S.N. 016-3941 (IL 7 East Leg 135th Street Box Culvert) o S.N. 016-0933 (IL 7 East Leg 131st Street Dual Box Culverts) o S.N. TBD (IL 7 East Side Driveway Box Culvert) o S.N. TBD (IL 7 East Side Driveway Box Culvert) The scope of work will consist of drainage improvements including replacing existing culverts, installing a new culvert along the west side of IL-7, regrading existing ditches, as well as realigning and regrading Mill Creek. In addition, roadway improvements include reconstruction, shifting the horizontal alignment of IL-7 away from Mill Creek, raising the roadway profile, installing a closed drainage system, and traffic signal modernization. A shared-use path is also proposed along the west side of IL-7 between 131st and 135th street. The department will furnish the Consultant with available microfilm plans, project report, hydraulic report, location drainage study and other available items The estimated construction cost for this project is $12,842,000. The completion date for this contract will be 18 months after authorization to proceed. The prime firm must be prequalified in the Highways (Roads and Streets) category to be considered for this project. Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering and Prequalification Agreement System (EPAS). Questions concerning should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764. The method of contractor selection has not been determined at this time. IDOT - FAU 3578 IL 7 (Southwest Highway) From 131st Street to 135th Street *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Design
Roads / Highways
$12,842,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 3, 2022
IL-7, Palos Park, IL
Related To This Project
Palos Park, IL
--
Palos Park, IL
Bid Date: May 23 2023
Palos Park, IL
Bid Date: Aug 09 2023
Palos Park, IL
Bid Date: Mar 11 2022
Palos Park, IL
Bid Date: Jan 10 2024
Palos Park, IL
Bid Date: Jun 14 2024
Palos Park, IL
Bid Date: Aug 08 2024
Palos Park, IL
Bid Date: Nov 14 2022
Aurora, IL
Bid Date: Apr 01 2022
Creve Coeur, IL
Bid Date: Apr 12 2022
Milford, IL
Bid Date: Apr 07 2022
Mount Erie, IL
Bid Date: Apr 05 2022
Rock Island, IL
Bid Date: Jun 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.