BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Winchester, Illinois. Contact the soliciting agency for additional information.

As of June 12, 2024, this project is nearing pre final design, design team has been awarded during Phase 2. General contractor bidding will take place in Spring 2025. Phase 3 will handle construction. *The closed solicitation has been included below for reference: This project may contain Federal Funds. The Complexity Factor for this project is 0.07. The Consultant selected for this project and all Subconsultants the prime Consultant will be using are scheduled to attend an initial meeting on May 02, 2019 at 1:30 P.M. in the Region Four/ District Six Office in Springfield. Phase II engineering services are required to replace the existing bridge with a new two-lane bridge and associated roadwork on IL 100/106 over the Illinois River at Florence. The Consultant scope of work is anticipated to include route surveys (pick-up), land surveys, preparation of right-of-way documents, permitting agency coordination, hydraulic analysis, geotechnical investigation which shall include in-situ testing, soil boring and sampling, and lab testing, drainage and roadway plans, TS&L plans, structure plans, traffic staging plans, temporary and permanent erosion control plans, and any other related work to complete final plans, specifications, and estimates. The selected Consultant may also be tasked to facilitate a Value Engineering Study as part of the anticipated scope of work. An Environmental Assessment (EA) is currently underway and is anticipated to be completed by December 2019. The department will furnish the Consultant with a preliminary draft of the EA, as-built plans, microfilm plans, route surveys, land surveys, field notes, traffic data, on-going permitting agency coordination, existing right-of-way plans, aerial photos, boring logs, hydraulic analysis and surveys, and other applicable information. This project will likely be on an expedited schedule and is projected for a FY 2022 letting. Timely completion of assignments in accordance with established schedules with few, if any, corrections is of primary importance. Any required corrections due to errors, omissions, or ambiguities on the Consultants part must be promptly completed by the Consultant in a timely manner. The following structure is included in this project, S.N. 086-0001 (Florence Bridge carrying IL 100/106 over the Illinois River). The completion date for this contract will be 60 months after authorization to proceed. The prime firm must be prequalified in the following categories to be considered for this project: Structures (Major River Bridges) Highways (Roads and Streets) Statements of Interest must also list experience of the staff presented in Exhibit A, and/or firm in accomplishing Structures: Major River Bridges. Statements of Interest must include details of how the Consultant will accomplish the work, a schedule for completing the work in the prescribed time, the firms capability and project team experience for similar projects, an organizational chart for the project, the firms understanding of the project goals, examples of successful past performance of the proposed project manager and team, the method to be used to meet the time, costs, etc. for final work products, and any innovative and independent methods to be used on the project. Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering and Prequalification Agreement System (EPAS). Questions concerning should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764. IDOT - IL 100/106 (Florence Bridge) over the Illinois River, Phase II Engineering

Award

Bridges / Tunnels

$78,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
51
Bidding Soon
782
All Active Projects
323
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2025

img_map_placeholder

IL-106, Winchester, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.