Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Winnipeg, Manitoba. Completed plans call for the renovation of a municipal facility.
The MacDonald Building, located at 344 Edmonton Street is within the center of the city of Winnipeg. The building was constructed in 1960-1961 and has numerous renovations and modifications done over its lifespan. It is a four-story building with a basement/lower level and houses multiple government departments with its largest tenant being Transport Canada. The roof membrane is original and nearing the end to its useful life. As the roof continues to age, frequency of roof leaks, damage and disruption to tenants increase. Replacement may provide opportunity to improve insulation values. Patching around the duct along roof was done in summer of 2013 as some leaks had developed in tenant space. BCR recommends replacing the built-up roof in 2013. The scope of work associated with this option involves completely replacing all the roofing systems on the MacDonald Building, with a new 2-ply Modified Bitumen insulated roofing system. In addition, the new insulation will be sloped to provide positive drainage to the existing roof drains. This will limit the standing water on the roof and the therefore reduce the potential for leakage. Due to the increase in overall insulation thickness, some modification to the curb heights for mechanical units will be required. It is unlikely that any parapets will have to be extended due to increased insulation thickness. All roof drains will have to be extended with this option. These costs are included within the estimate. Roofs installed to the current National energy Code of Canada (2015) require an overall thermal transmittance of 0.162 W/(m2 K), equivalent to RSI 6.17 or R-35. Therefore, an R35 roof meets the requirements. The addition of a fully adhered vapor barrier will assist in the total performance of the new roof system, including a detailed membrane at all roof wall interfaces. The new roof system will meet and exceed the CSA123.21 roof assemblies for wind uplift. Official bid documents must be obtained from www.bgis.merx.com and bid submissions must be done through the Merx platform.
Post-Bid
Municipal
$1,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better bids. Win.
The best source for commercial construction data, period. Get instant access to up to five free projects and companies. Subscribe all contacts, documents, and details so that you can find new opportunities and win new business.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
January 10, 2022
February 10, 2022
June 29, 2023
344 Edmonton St, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Aug 05 2022
Winnipeg, MB
Bid Date: May 16 2022
Winnipeg, MB
Bid Date: Jun 22 2022
Winnipeg, MB
Bid Date: Aug 09 2022
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Aug 09 2022
Winnipeg, MB
Bid Date: Jun 30 2022
Winnipeg, MB
Bid Date: Jan 25 2023
Winnipeg, MB
Bid Date: Jun 08 2022
Winnipeg, MB
Bid Date: Jun 15 2022
Winnipeg, MB
--
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Aug 04 2022
Winnipeg, MB
Bid Date: Jun 15 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--