Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in San Diego, California. Completed plans call for the renovation of a educational facility.

The project estimate is between $680,000 and $750,000. This is a not a PSA project and does not require prequalification. The District requires that Bidders possess any of the following classification(s) of California State Contractors License(s), valid and in good standing, at the time of bid opening and contract award: C-10. A mandatory site visit in front of the main office of Hage Elementary School, 9750 Galvin Avenue, San Diego, CA 92126 and upon completion will proceed to Foster Elementary School, 6550 51st Street, San Diego, CA 92120 and upon completion will proceed to Marvin Elementary School, 5720 Brunswick Avenue, San Diego, CA 92120 and upon completion will proceed to Hearst Elementary School, 6230 Del Cerro Boulevard, San Diego, CA 92120 and upon completion will proceed to Benchley Weinberger Elementary School, 629 Twin Lake Drive, San Diego, CA 92119 and upon completion will proceed to Gage Elementary, 6811 Bisby Lake, San Diego, CA 92119. Day 2 in front of the main office of Mann Middle School, 4345 54th Street, San Diego, CA 92115 and upon completion will proceed to Crawford High School, 4191 Colts Way, San Diego, CA 92115 and upon completion will proceed to Rolando Park Elementary School, 6620 Marlowe Drive, San Diego, CA 92115 and upon completion will proceed to Freese Elementary School, 8140 Green Lawn Drive, San Diego, CA 92114 and upon completion will proceed to Audubon Elementary School, 654 Bonsal Street, San Diego, CA 92114. All late bids shall be deemed non-responsive and not opened. Each bid shall be in accordance with all terms, conditions, plans, specifications and any other documents that comprise the bid package. If the payment for Bid and Contract Documents is refundable, refunds will be processed by the District only if the Bid and Contract Documents, including all addendums, are returned intact and in good order to Crisp Imaging within ten (10) days of the issuance of the Final Bid Tabulation. Online documents are available for download on PlanWell through Crisp Imaging. (Questions: 949-285-3171). All bids shall be submitted on bid forms furnished by the District in the bid package beginning February 12, 2019. Bid packages will not be faxed. SENATE BILL (SB) 854 REQUIREMENTS: Effective July 1, 2014, no contractor or subcontractor may be listed on a bid proposal, or awarded a contract for a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code 1771.1(a)]. This project is subject to compliance monitoring and enforcement by the DIR. Prime contractors must add the DIR Registration Number for each of their listed subcontractors to the Subcontractors List AND submit a certificate of registration for their own firm and those of their listed subcontractors upon request by the District. Failure of the bidding prime contractor to list their subcontractors DIR Registration Number on the Subcontractors List at time of bid may result in rejection of their bid as non-responsive. Prevailing wage requirements apply to all public works projects and must be followed per Article 17 of the General Conditions of this bid. Pursuant to Resolution In Support of Service Disabled Veterans Owned Businesses (SDVOB) and Disabled Veteran Business Enterprises (DVBE) approved on May 10, 2011 by the Board of Education, the Bidder is required to satisfy a minimum DVBE participation percentage of at least three percent (3%) for this project. In compliance with this Program, the Bidder shall satisfy all requirements enumerated in the bid package. Each bid must be submitted on the Bid Form provided in the bid package and shall be accompanied by a satisfactory bid security in the form of either a bid bond executed by the bidder and Surety Company, or a certified or cashier's check in favor of the San Diego Unified School District, in an amount equal to ten percent (10%) of their bid value. Said bid security shall be given to guarantee that the Bidder will execute the contract as specified, within five (5) working days of notification by the District. The District reserves the right to reject any and all bids and to waive any irregularities or informalities in any bids or in the bidding process. No bidder may withdraw his bid for a period of 120 days after the date set for the opening of bids. For information regarding bidding, please call 858-522-5840.

Award

Educational

$547,700.00

Public - City

Renovation

560

19

10

9

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
27
Bidding Soon
726
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2019

May 17, 2019

img_map_placeholder

Multiple Locations, San Diego, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.