Site work and new construction of a water / sewer project in San Diego, California. Working plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

This solicitation was cancelled by the owner. *No further inquiries are being accepted. The North City Project is the first phase of the Pure Water Program, which will produce potable recycled water for the City of San Diego (City). The North City Project will expand the existing North City Water Reclamation Plant (NCWRP) and construct an adjacent North City Pure Water Facility (NCPWF). The construction of the North City Project will result in unavoidable impacts to vernal pool resources and upland habitats. Mitigation for impacts is required pursuant to City guidelines. This SANDER Mitigation Plan (SANDER) for the North City Project (Mitigation Plan) includes a description of activities to restore, enhance, and preserve vernal pools and upland habitat to satisfy the vernal pool and upland habitat mitigation requirements for the North City Project. The Contractor shall implement the project consistent with the SANDER Mitigation Plan for the North City Project - Pure Water and the City's Vernal Pool Habitat Conservation Plan (VPHCP). The scope of work under this contract shall consist of preparing the site for restoration, removal of trash and debris, treatment and removal of exotic plant species, installation of a temporary irrigation system, contouring and grading disturbed soil surfaces to improve and create wetland hydrology, procuring and installing native container plants and seed and completion of a plant establishment period. The ontract includes a 5 year (60 month) maintenance period where the site shall be maintained to successfully restore and enhance upland and wetland habitats onsite through regular maintenance including trash removal, weeding, and watering of native plant material. Subcontracting participation percentages apply to this contract. Project Location:-adjacent to 5183 Mercury Point Road and 5180 Mercury Point, San Diego, CA92111 The Contract Time for completion of the Work, including the Plant Establishment Period, shall be 184 Working Days. 1. SLBE participation 4.7% 2. ELBE participation 6.3% 3. Total mandatory participation 11.0% The purpose of the meeting is to discuss the scope of the Project, submittal requirements, the prequalification process and any Equal Opportunity Contracting Program requirements and reporting procedures. To request a sign language or oral interpreter for this visit, call Public Works Contracts at (619) 533-3450 at least 5 Working Days prior to the meeting to ensure availability To be eligible for award of this contract, Prime contractor must Possess the following licensing classification: C-27 The City has incorporated mandatory SLBE-ELBE subcontractor participation percentages to enhance competition and maximize subcontracting opportunities. For the purpose of achieving the mandatory subcontractor participation percentages, a recommended breakdown of the SLBE and ELBE subcontractor participation percentages based upon certified SLBE and ELBE firms has also been provided to achieve the mandatory subcontractor participation percentages:1. SLBE participation 4.7% 2. ELBE participation 6.3% 3. Total mandatory participation 11.0%.

Final Planning

Water / Sewer

$1,549,108.00

Public - City

New Construction, Site Work

47

10

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
33
Bidding Soon
922
All Active Projects
406
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2019

February 3, 2020

img_map_placeholder

5183 Mercury Point, San Diego, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.