Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a water / sewer project in San Diego, California. Working plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
This solicitation was cancelled by the owner. *No further inquiries are being accepted. The North City Project is the first phase of the Pure Water Program, which will produce potable recycled water for the City of San Diego (City). The North City Project will expand the existing North City Water Reclamation Plant (NCWRP) and construct an adjacent North City Pure Water Facility (NCPWF). The construction of the North City Project will result in unavoidable impacts to vernal pool resources and upland habitats. Mitigation for impacts is required pursuant to City guidelines. This SANDER Mitigation Plan (SANDER) for the North City Project (Mitigation Plan) includes a description of activities to restore, enhance, and preserve vernal pools and upland habitat to satisfy the vernal pool and upland habitat mitigation requirements for the North City Project. The Contractor shall implement the project consistent with the SANDER Mitigation Plan for the North City Project - Pure Water and the City's Vernal Pool Habitat Conservation Plan (VPHCP). The scope of work under this contract shall consist of preparing the site for restoration, removal of trash and debris, treatment and removal of exotic plant species, installation of a temporary irrigation system, contouring and grading disturbed soil surfaces to improve and create wetland hydrology, procuring and installing native container plants and seed and completion of a plant establishment period. The ontract includes a 5 year (60 month) maintenance period where the site shall be maintained to successfully restore and enhance upland and wetland habitats onsite through regular maintenance including trash removal, weeding, and watering of native plant material. Subcontracting participation percentages apply to this contract. Project Location:-adjacent to 5183 Mercury Point Road and 5180 Mercury Point, San Diego, CA92111 The Contract Time for completion of the Work, including the Plant Establishment Period, shall be 184 Working Days. 1. SLBE participation 4.7% 2. ELBE participation 6.3% 3. Total mandatory participation 11.0% The purpose of the meeting is to discuss the scope of the Project, submittal requirements, the prequalification process and any Equal Opportunity Contracting Program requirements and reporting procedures. To request a sign language or oral interpreter for this visit, call Public Works Contracts at (619) 533-3450 at least 5 Working Days prior to the meeting to ensure availability To be eligible for award of this contract, Prime contractor must Possess the following licensing classification: C-27 The City has incorporated mandatory SLBE-ELBE subcontractor participation percentages to enhance competition and maximize subcontracting opportunities. For the purpose of achieving the mandatory subcontractor participation percentages, a recommended breakdown of the SLBE and ELBE subcontractor participation percentages based upon certified SLBE and ELBE firms has also been provided to achieve the mandatory subcontractor participation percentages:1. SLBE participation 4.7% 2. ELBE participation 6.3% 3. Total mandatory participation 11.0%.
Final Planning
Water / Sewer
$1,549,108.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 15, 2019
February 3, 2020
5183 Mercury Point, San Diego, CA
Related To This Project
San Diego, CA
Bid Date: Jun 27 2023
San Diego, CA
Bid Date: Aug 11 2023
San Diego, CA
Bid Date: Jun 05 2023
San Diego, CA
Bid Date: Jun 04 2021
San Diego, CA
Bid Date: Sep 08 2023
San Diego, CA
Bid Date: Jul 13 2023
San Diego, CA
Bid Date: Jun 19 2023
San Diego, CA
--
San Diego, CA
Bid Date: Sep 15 2020
San Diego, CA
Bid Date: Jul 27 2020
San Diego, CA
Bid Date: Dec 08 2020
San Diego, CA
Bid Date: Jun 14 2023
San Diego, CA
Bid Date: Jun 01 2023
San Diego, CA
Bid Date: Aug 29 2023
San Diego, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.