Site work for a mixed-use development in Waukee, Iowa. Completed plans call for site work for a sidewalk / parking lot; and water / sewer project.
Bids received by the City will be opened and publicly read at the Council Chamber in City Hall, 230 West Hickman Road, Waukee, Iowa 50263, with the results being reported to the Waukee City Council at their meeting on Monday, March 18, 2019 at 5:30 PM, Central Time, at which time the Council may take action on the proposals submitted or at such time as may then be fixed.The extent of the work on this project is the furnishing of all labor, equipment, and materials for the construction of improvements in Waukee generally described as follows: The project is the development of a new neighborhood park including the mass grading, fine grading and provision of utilities to provide water, storm sewer, electrical service and sanitary sewer to the site. Amenities include: paved parking, a restroom/storage room building, playground, paved walking paths and landscaping. This project also includes additive alternates for a wet play area, additional paved trail and shaded shelters over a paved pad for a picnic table. This project includes accommodations for storm water management. The kinds of materials, estimated quantities, and work to be done for the project on which bids will be received are as shown on the bid proposal for said project. All work is to be done in strict compliance with the Plans and Specifications prepared by the Architect/Engineer which have been heretofore approved by the City Council and which are now on file for public examination in the office of the City Clerk. All bids shall be made on a form furnished by the City and shall be filed before the time specified above, in a sealed envelope addressed to the City Clerk of Waukee, Iowa, clearly stating that the envelope contains a bid on this project. Each bidder shall accompany its bids with bid security as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in a form acceptable to the City for the faithful performance of the contract and guaranteeing payment to all persons supplying labor and/or materials in the execution of the work provided for in the contract, in an amount equal to 100% of the amount of the contract. Additionally the bidder must provide the City with a guarantee of maintenance of said improvement for a period of two (2) years from the time of acceptance by the City. The bidder's security shall be in an amount equal to ten percent (10%) of the total amount of the bid and shall be in the form of a cashier's check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the City. The bid shall contain no condition except as provided in the specifications. If the bidder fails to execute the contract and to furnish an acceptable performance, payment, and maintenance bond or provide a Certificate of Insurance within ten (10) days after acceptance of the bid by the City, the bid security may be forfeited or cashed by the City as liquidated damages. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the State of Iowa. In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed nonresponsive and rejected. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. Work on said project shall commence within ten (10) days of a written notice to proceed and shall be completed by: October 1, 2019. The duration of the work is critical to the project so as to minimize damage to other streets and public infrastructure and the disruption associated with the project to the public. Damages in the amount of five hundred dollars ($500.00) per calendar day will be assessed for each day the work shall remain uncompleted after the end of the contract period at the sole discretion of the City which at the option of the City may be deducted from any retainage prior to release, the final payment to contractor, or through the commencement of a cause of action by the City, in the City's sole discretion. The selection by the City of any particular course of action hereunder is not exclusive and shall not preclude the pursuit of additional remedies by the City. In the event the City institutes legal proceedings, the Contractor shall be responsible for any and all attorney's fees and expenses. Payment for the work will be made by the City in cash from such funds as may be legally available including cash on hand, proceeds from the sale and issuance of General Obligation Bonds and such other funds including the proceeds from the sale and issuance of such other bonds as may lawfully be issued as the City Council may at its sole discretion determine and provide. Payment to the Contractor will be on the basis of monthly estimates equivalent to ninety-five percent (95%) of the contract value of the work completed and payments made to material suppliers for materials ordered specifically for the project or delivered to the site during the preceding calendar month. Estimates will be prepared on the first day of each month by the Contractor, subject to the approval of the Engineer. Such monthly payments shall in no way be construed as an act of acceptance for any part of the work partially or totally completed. Final payment by the City will be made in accordance with Iowa statutes and the contract documents. The City reserves the right to reject any and/or all bids and to waive any and/or all technicalities and/or all irregularities.
Award
Water / Sewer
$532,639.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 13, 2019
April 12, 2019
To Be Determined, Waukee, IA
Related To This Project
Waukee, IA
Bid Date: Jan 30 2019
Waukee, IA
--
Waukee, IA
--
Waukee, IA
Bid Date: Apr 26 2022
Waukee, IA
Bid Date: Apr 12 2022
Waukee, IA
Bid Date: Apr 13 2022
Waukee, IA
Bid Date: Apr 26 2022
Waukee, IA
Bid Date: Mar 30 2022
Waukee, IA
Bid Date: Feb 13 2020
Waukee, IA
Bid Date: Apr 21 2020
Waukee, IA
Bid Date: Dec 09 2021
Waukee, IA
Bid Date: Mar 10 2022
Waukee, IA
Bid Date: Apr 15 2022
Waukee, IA
--
Waukee, IA
Bid Date: Aug 10 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.