BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of an educational facility in Wilson, North Carolina. Conceptual plans call for the demolition of a educational facility; for the construction of a 15,000-square-foot educational facility; and for site work for a educational facility.

As of June 24, 2022, this project is in the conceptual phase. An architect has not been selected. A a firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Wilson Community College, 902 Herring Avenue E, is accepting statements of interest for design and/or engineering services for the design, layout, and construction management of demolition (Buildings S and T) and construction of a new Building S, located at the Wilson Community College Lee Technology Center. The project will include demolition of current Lee Technology Center Buildings S and T and construction of one new (15,000 sq. ft. plus) Building (S) that will provide classrooms, offices, lab space for Air Conditioning, Heating, and Refrigeration Technology; Electrical Systems Technology; Building Construction Technology programs, and any further programs expansion. This project also includes related landscaping and site improvements. The proposed budget for this project, including design/engineering services is $5,163,372. The proposing firm must hold a valid license to practice in the State of North Carolina. In order to offer architectural, engineering, or landscape architectural services in response to this solicitation, the proposing firm must be properly licensed to practice Architecture, Engineering, or Landscape Architecture in the State of North Carolina. Proposing firms must submit THREE (3) copies of the Letter of Interest and THREE (3) copies of your current Standard Form 254 (SF 254) with the information package. The current SF 254 template is located electronically which is the State Building Commission approved form. In the interest of cost-savings to the designers, consistency of the submittals and more efficient use of time by the pre-selection committee, the submitted information package should not include any notebooks, binders, tab, clips, etc. The format should be 8-1/2 x 11 pages stapled in the upper left-hand corner. The Letter of Interest should not exceed ten (10) single-sided pages or five (5) double-sided pages plus the SF 254. E-mail and Fax submittals will not be accepted. As of July 19, 2021, the project is currently under evaluation stage. An issuance of draft request for proposal to short-listed firms has not been released. The design firm selection timeline has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Educational

$5,163,372.00

Public - City

Demolition, New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
55
Bidding Soon
1,040
All Active Projects
361
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2022

img_map_placeholder

902 Herring Ave E, Wilson, NC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.