BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2019 at 8:00 PM

Updated October 24, 2023

Site work for a civil project in Attleboro, Massachusetts. Completed plans call for site work for a water / sewer project.

Dodgeville Pond Dam repairs and improvements, removal of inappropriate vegetation and their root systems from the embankment, installation of supplemental riprap at the upstream slope and new riprap at the downstream slope and toe, installation of a waler bracing system at the existing sheet pile wall, and re-pointing/restoration of portions of the masonry spillway training walls. Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.

Award

Water / Sewer

$322,115.00

Public - City

Site Work

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
591
Active Projects
275
Bidding Soon
4,395
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2019

April 4, 2019

Project location map

453 S Main St, Attleboro, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.