EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 2, 2019 at 8:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Pittsburgh, Pennsylvania. Completed plans call for the renovation of a municipal facility.

ALCOSAN encourages businesses owned and operated by minorities and women to submit bids on Authority Contracts or to participate as subcontractors or suppliers to successful Bidders. Successful Bidders are to use minority and women's businesses to the fullest extent possible. Bid Security shall be furnished by providing with the Bid a Certified Check or Bid Bond in the amount of 10% of the Bid Price. Any questions regarding the Contract Documents shall be directed to Ms. Elizabeth A. Joyce, Project Engineer, by e-mail to elizabeth.lovecrcalcosan.org, or by fax to (412)734-8716, or by phone to (412) 734-8719. The Authority reserves the right to reject any or all bids, to waive any informality in any bid and to accept any bid should it be deemed in the interest of the Authority to do so. The undersigned Bidder certifies that they have read and understand the Information for Bidders Section entitled "Minority and Women's Business Enterprise and Labor Surplus Area Policy," and further understand and agree to the minority participation goal applicable to this Contract, and shall strive to expend from ten to twenty-five percent (10-25%) of the total cost of the Contract for minority and women's business enterprise participation. The following scope of work applies to this Contract. 1. The work shall include but not be limited to the following: a. Mobilize to the site and conduct size and verification measurements to prepare shop drawings and procure required materials. b. For each site, install safety rails, tie off anchor points, handholds and other appurtenances as shown on drawings. c. In conjunction with the manufacturer, prepare shop drawings for submittal to the OWNER. d. Construct coffer dams and perform bypass pumping as necessary for progression of the work. e. Remove and properly dispose of all debris associated with the demolition and construction. Remove and properly dispose of all designated rails, anchors, and other appurtenances. f. Repair and seal concrete in designated structures. g. Provide Manufacturer Services for the installation and certification of Protective Epoxy Polymer Lining System for Concrete Wastewater Structures. It is expected that each of the four structures will have two site visits by the Manufacturer’s Representative, approximately half a work day in length each. One of these visits will be to verify that the surface is properly prepared and the structure is ready for application and the second is to verify that the finished application meets the Manufacturer’s requirements. Two additional visits are to be included for the Manufacturer’s Representative to help with initial set up or any issues that may arise. h. Maintain constant sewage flow. 2. Contractor shall perform all other work related to the items listed above to provide a complete and functional system and restored project site.

Award

Municipal

$916,345.00

Public - County

Renovation

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork, Wood Stairs and Railings
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Sanitary Sewerage
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Manufacturing Equipment, Machining Equipment, Drilling Equipment

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
106
Bidding Soon
991
All Active Projects
468
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2019

April 22, 2019

img_map_placeholder

Multiple Locations, Pittsburgh, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Safety Upgrades and Repairs to Diversion Structures

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.