BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 30, 2019 at 8:00 PM

Updated September 17, 2024

Renovation of a water / sewer project in Seabrook, Texas. Working plans call for the renovation of a water / sewer project.

Estimate: $3,000,000 - $3,200,000 The Pine Gully Wastewater Treatment Plant - Phase 1A will be located on Park Drive, North of the new Public Works Facility. The project includes alternative phasing to ultimately replace the existing WWTP, upsizing the existing lift station on Bayview to handle increased hydraulic capacity, and approximately 6,500 LF of force main along Bayview and Red Bluff.

Final Planning

Water / Sewer

$3,200,000.00

Public - City

Renovation

58

1

8

9

Subscribe For Documents

179 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
211
Bidding Soon
3,155
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2019

June 3, 2019

Project location map

To Be Determined, Seabrook, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.