BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Pittsburgh, Pennsylvania. Design plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of July 2022, the project is in preliminary engineering design phase. Construction is expected to begin in late 2024. *The closed solicitation has been included below for reference: The Swinburne Bridge carries Frazier Street over Saline Street, a residential neighborhood, and two active CSXT railroad tracks, in the City of Pittsburgh's Four Mile Run, South Oakland and Greenfield Neighborhoods. This is a bridge replacement project, and the replacement structure will be wider to accommodate one additional lane. Improvements to the existing alignment are to be investigated. An alternatives analysis will be needed to compare project alternatives to the project purpose and need, environmental features, and other constraints. The alternatives analysis should compare, at a minimum, different structure types and their associated impacts. A full description of services and general requirements for submissions can be found on PennDOT's ECMS via electronically. All candidates must be a current registered Business Partner with the Pennsylvania Department of Transportation and must read and acknowledge "General Consultant Candidate Requirements and Information for City of Pittsburgh Sponsored Federally Funded Transportation Projects" by including a statement in the Statement of Interest. See Advertisement on ECMS. Consultant teams must comply with Section 177A.02 Equal Employment Opportunity Practice and Goals of the City of Pittsburgh, Code of Ordinances. The City will be using the modified consultant selection process for securing the professional services. The anticipated Notice to Proceed date is September 1, 2019. All questions and answers are required to go through ECMS's "Questions and Responses" Forum. The Method of Contractor selection has not been determined at this time.

Design

Bridges / Tunnels

$6,011,125.00

Public - City

Demolition, New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
43
Bidding Soon
836
All Active Projects
325
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2024

img_map_placeholder

To Be Determined, Pittsburgh, PA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.