BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 10, 2025 at 7:00 PM

Updated February 11, 2025

Demolition, site work and new construction of a water / sewer project in El Dorado Hills, California. Conceptual plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

Update:https://www.eid.org/home/showpublisheddocument/17379/638652883751530000 The District has numerous distribution pump stations throughout the water service area that operate to increase pressures to customers at higher elevations. The District has an annual program to replace, rehabilitate or upgrade pump stations that have reached the end of their service life. The Crestview Pump Station is in need of replacement due to maintenance issues with an existing buried pneumatic tank, which cannot be certified for the operating pressure due to the inability to examine the entire structure. This is a safety issue for the District as we cannot certify the existing tank for service. The existing single pump is also located within a confined space and is a potential maintenance hazard. Without the benefit of a second pump, 25 customers are taken out of water for any regular maintenance. Additionally, the station air compressors have failed due to being underground causing the pipeline to become air locked and causing various leaks on the distribution piping. Construction is anticipated to be accomplished with District crews. Project is included El Dorado Irrigation District (EID) Fiscal Year 2025-2029 Page No 35 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update:https://www.eid.org/home/showpublisheddocument/16625/638386714615830000 Crestview Pump Station Replacement Project - 17011 - Construction, 700,000 Project is included El Dorado Irrigation District (EID) Fiscal Year 2024-2028 CIP ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The District has numerous distribution pump stations throughout the water service area that operate to increase pressures to customers at higher elevations. This is an annual program to replace, rehabilitate or upgrade pump stations that have reached the end of their service life. Engineering and O&M staff identify and prioritize pump stations in need of upgrades to ensure reliable supply of the necessary pressure and flow to their respective service areas, and to comply with fire flow requirements and incorporate emergency standby power where needed. Replacement components include pumps, hydropneumatic tanks, electrical control, valves, yard piping, SCADA equipment, and buildings to accommodate equipment. The Crestview Pump Station is in need of replacement due to maintenance issues with an existing buried pneumatic tank which was not able to be certified due to the inability to examine the entire structure. The existing single pump is also located within a confined space and is a potential maintenance hazard. With no backup pump customers are taken out of water for any regular maintenance. As of January 22, 2022, this project is currently in the FY 2022-2026 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$300,000.00

Public - County

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
404
Active Projects
171
Bidding Soon
2,318
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

Project location map

To Be Determined, El Dorado Hills, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.