BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a civil project in El Dorado Hills, California. Completed plans call for site work for a road / highway; for the renovation of a water / sewer project; road / highway; and water / sewer project.

**As of October 17,2023, project was awarded to Herc Rentals, Inc., awarded amount is $40,659.86.** El Dorado Irrigation District (District), an irrigation special district organized and existing under the California Irrigation District Law (Water Code 20500, et seq.), hereby gives notice that it is now accepting Bids for Temporary Bypass Pumping Services at the Marina Village #1 Lift Station Question Deadline 08/24/2023 at 5:00 PM PT Any questions about this RFP shall be submitted in writing (via e-mail) to only, Buyer, at the following address: E-mail: rdeakyne@eid.org Description of Project: El Dorado Irrigation District's Marina Village #1 sewer lift station is located in El Dorado Hills, CA adjacent to the entrance to Brown's Ravine State Park of Folsom Lake. This lift station includes a wet well with two submersible pumps that pump inline with above grade booster pumps to deliver the necessary head to convey the flow through the forcemain. The District has found that the riser pipes from the submersible pumps in the wet well have suffered severe corrosion and require replacement within the wet well. To do this, the wet well must be taken out of service and bypassed to allow for entrance and work by EID's sewer maintenance personnel. Bypassing of this station requires bypass pumps to be set up at the 2 separate gravity main inlets to the wet well with the inlets plugged. It also requires a high head discharge into the forcemain at approximately 120 psi. The concept for the bypass is to have 2 low head pumps that discharge to an onsite emergency storage tank, and then a single high head pump to pump into the forcemain, to keep the high head pump running more constantly and to only have 1 high head pump in operation. B. Scope: This Section covers temporary bypass pumping requirements, required of the SUPPLIER that shall apply during the project, including but not limited to furnishing all materials, labor, equipment, power, maintenance, etc. to implement a temporary pumping system for the purpose of diverting the existing sanitary sewer flow around El Dorado Irrigation District's Marina Village #1 Lift Station as necessary for District Staff to complete work inside the existing wet well.

Award

Water / Sewer

$40,660.00

Public - County

Renovation, Site Work

3

6

9

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
81
Bidding Soon
1,403
All Active Projects
588
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2023

October 9, 2023

img_map_placeholder

Multiple Locations, El Dorado Hills, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.