BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a pre-engineered storage facility in Victorville, California. Working plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

**As of June 7, 2019, bids were rejected for being over budget. The City of Victorville is requesting bids to Furnish, Deliver and Erect a Steel Building for Public Works Palmdale Yard and D2 Water Warehouse. This is a prevailing wage project. The meeting will take place at the City of Victorville, Conference Room A, 14343 Civic Drive, Victorville, CA. (Main office 760- 955-5000) The City will not accept bids from bidders who do not attend this mandatory pre-bid meeting. The Contract shall be signed by the successful bidder and returned, together with contract bonds, copies of insurance policies, and copy of City of Victorville Business License within 10 days, not including Friday, Saturday, Sunday, and legal holidays, after the bidder has received the Contract for execution.executed Construction Agreement will be provided to the awarded Contractor during the pre-construction meeting. All submittals have to be approved by the Project Manager and a Notice to Proceed will be issued prior to beginning of work. All contractors shall be licensed in accordance with the laws of State of California, must hold a valid California Contractors license B BOND REQUIREMENTS: Prior to execution of the Contract, the successful bidder shall provide a one-hundred percent (100%) Faithful Performance Bond and a one-hundred percent (100%) Payment Bond based on the bid amount accepted by the City. The Contractor shall pay the City/District the sum of ONE THOUSAND FIVE HUNDRED 00/100 DOLLARS ($1,500.00) per calendar day for each and every calendar day delay in finishing the work in excess of ONE HUNDRED DAYS (120) CALENDAR DAYS PER LOCATION as specified above as Liquidated Damages. Bid Result PALMDALE YARD MGP Construction-$228,086 D2 WAREHOUSE MGP Construction-$298,381

Final Planning

Warehouse / Distribution - Pre-Engineered Storage Building

$526,467.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
88
Bidding Soon
2,098
All Active Projects
950
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2019

December 9, 2019

img_map_placeholder

Multiple Locations, Victorville, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.