Published May 29, 2019 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Inver Grove Heights, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

For furnishing of all work and materials for the consideration of City Project Numbers 2018-08D & 2018-09F, consisting of approximately: Boulevard Restoration (Seeding) 4,000 SY Bituminous Paving 3,600 TON Full Depth Reclamation 5,887 SY Common Excavation 7,600 CY Aggregate Base Class 5 3,500 TON Boulevard Topsoil Borrow 440 CY Select Granular Borrow 4,400 CY Concrete Curb and Gutter 3,200 LF RCP Storm Sewer 430 LF Storm Sewer Structures 22 EA Concrete Driveway Pavement 200 SY Bituminous Driveway Pavement 70 TON Work on this project must be substantially completed by September 13, 2019 All work shall be completed by October 12, 2019 Bids must be on the basis of cash payment for the work and materials, and no bid will be considered unless sealed and filed with the City Clerk and accompanied by a cash deposit, certified check, or bidder's bond, payable to the City, for not less than 5% of the bid, as a guarantee that the bidder will, within fifteen (15) days after notification of the award of contract, enter into an agreement with the City and furnish a bond for the full amount of the contract as provided by law. This deposit will be subject to forfeiture as provided by law. Cash deposits, certified checks, and bidder's bonds of the three (3) lowest bidders may be retained until the contract has been awarded and executed, but no longer than 90 days from the date of opening bids. All other deposits will be refunded promptly. The City reserves the right to reject any and all bids, to waive any informality therein, and to adjourn the meeting to a later date for the purpose of further consideration of the bids and taking action thereon. No bid may be withdrawn within 90 days after the date of opening of bids. The City Council will consider award of contract at their regular meeting held at City Hall on Monday, May 27, 2019 at 7 PM, or a later date as determined by Council, in the Council Chambers at 8150 Barbara Avenue.

Award

Roads / Highways

$1,451,554.00

Public - County

Paving, Site Work

51

1

8

7

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Unit Prices, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Cleaning and Waste Management, Site Maintenance, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 08 - Openings

Division 08 - Openings

Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Storage Specialties, Postal Specialties
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Piece Material Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
59
Bidding Soon
994
All Active Projects
426
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2019

May 13, 2019

img_map_placeholder

Atwater Path E, Inver Grove Heights, MN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Atwater Path Pavement Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.