BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Inver Grove Heights, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

For furnishing of all work and materials for the consideration of City Project Numbers 2018-08D & 2018-09F, consisting of approximately: Boulevard Restoration (Seeding) 4,000 SY Bituminous Paving 3,600 TON Full Depth Reclamation 5,887 SY Common Excavation 7,600 CY Aggregate Base Class 5 3,500 TON Boulevard Topsoil Borrow 440 CY Select Granular Borrow 4,400 CY Concrete Curb and Gutter 3,200 LF RCP Storm Sewer 430 LF Storm Sewer Structures 22 EA Concrete Driveway Pavement 200 SY Bituminous Driveway Pavement 70 TON. Work on this project must be substantially completed by September 13, 2019 All work shall be completed by October 12, 2019 Bids must be on the basis of cash payment for the work and materials, and no bid will be considered unless sealed and filed with the City Clerk and accompanied by a cash deposit, certified check, or bidder's bond, payable to the City, for not less than 5% of the bid, as a guarantee that the bidder will, within fifteen (15) days after notification of the award of contract, enter into an agreement with the City and furnish a bond for the full amount of the contract as provided by law. This deposit will be subject to forfeiture as provided by law. Cash deposits, certified checks, and bidder's bonds of the three (3) lowest bidders may be retained until the contract has been awarded and executed, but no longer than 90 days from the date of opening bids. All other deposits will be refunded promptly. The City reserves the right to reject any and all bids, to waive any informality therein, and to adjourn the meeting to a later date for the purpose of further consideration of the bids and taking action thereon. No bid may be withdrawn within 90 days after the date of opening of bids. The City Council will consider award of contract at their regular meeting held at City Hall on Monday, May 27, 2019 at 7 PM, or a later date as determined by Council, in the Council Chambers at 8150 Barbara Avenue.

Award

Roads / Highways

$1,451,554.00

Public - City

Paving, Site Work

51

7

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
47
Bidding Soon
765
All Active Projects
336
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2019

May 13, 2019

img_map_placeholder

55th St E, Inver Grove Heights, MN

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.