BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Dothan, Alabama. Completed plans call for the renovation of a detention facility.

As of 5/08/2019: Award date of May 13, 2019 1. Contractor shall prepare the existing roofing system for the 60 mil PVC membrane to be installed. Contractor will set up job site to meet safety requirements set forth by OSHA standards. 2. Tear off the existing roofing system and insulation down to the concrete deck. All trash and debris shall be hauled off-site and disposed of properly. 3. Install a Duro-Last vapor barrier to the primed concrete deck to specification. 4. Install a minimum R-25 tapered Poly ISO insulation start thickness with 1/4 " slope to the drains fully adhered with board max low-rise foam to specification. 5. Install a 1/4 " cover board over the new specified ISO insulation fully adhered with board max low-rise foam adhesive to specification. 6. Contractor shall furnish and install a new white 60 MIL Duro-Last Roofing system (Basis of Design) to be full adhered with water base adhesive to Duro-Last specifications. The membrane must have a minimum of 28 mils above the scrim. 7. Install new 60 mil membrane wall flashing fully adhered to specification. 8. Install new 24-gauge metal edge detail with Kynar cover to specification. Color to be chosen by the owner. 9. Add new 4x4 treated wood sleepers underneath all piping and conduit lines on roof. 10. Install fully adhered manufactures walk pads as a walkway around All sides of HVAC units 5 feet wide with a walk way to roof access a for membrane protection. 11. Install pre-manufactured flashings on all roof penetrations as specified by roof membrane manufacturer. 12. All penetrations shall extend a minimum 8" above finished roof system. 14. Contractor must install the roofing system and dispose of all debris in accordance with all local, state, and federal regulations. 15. After the installation is complete, a Duro-Last Quality Technical Representative shall inspect the visible details of the roofing system for acceptability of warranty issuance. Any deficiencies shall be corrected by the Contractor and made ready for re-inspection within five (5) working days. Upon acceptance, the15-year NDL Duro-Last Roofing warranty shall be promptly issued.

Bid Results

Jails / Prisons

$219,350.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
20
Bidding Soon
426
All Active Projects
174
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2019

June 5, 2019

img_map_placeholder

164 N Oates St, Dothan, AL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.